📞 +91 98200 30685 ✉️
RERA: A51800043517

PALAVA VIENTO A to D

by Palava Dwellers Private Limited Company
Certificate Signed P51700000342
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700000342
Registration No.
REA51700002850
Registration Date
2018-10-11
Developer
Palava Dwellers Private Limited Company
Architect
Vilas Desai & Associates
Project Bank
HDFC BANK
Proposed Possession
2018-03-31
Revised Possession
2018-03-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
5137.00 sq.m
Total FSI
27759.81
Approved FSI
26469.81
MahaRERA QR
PALAVA VIENTO A to D
MahaRERA — P51700000342
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
🚗Open Parking32
🅿️Closed Parking77
📅Completion2018-03-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking32
🅿️Closed Parking77
📅Completion2018-03-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking15
🅿️Closed Parking58
📅Completion2018-03-31
🏗️Proposed Floors18
Sanctioned18
🚗Open Parking17
🅿️Closed Parking92
📅Completion2018-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 43.77000045776367 0 0 0
0%
1Bhk 43.79999923706055 0 0 0
0%
1Rk 29.149999618530273 0 0 0
0%
2Bhk 52.86000061035156 0 0 0
0%
2Bhk 54.7400016784668 0 0 0
0%
2Bhk 56.540000915527344 0 0 0
0%
2Bhk 57.599998474121094 0 0 0
0%
2Bhk 57.900001525878906 0 0 0
0%
2Bhk 57.970001220703125 0 0 0
0%
2Bhk 58.41999816894531 0 0 0
0%
2Bhk 58.439998626708984 0 0 0
0%
2Bhk 59.119998931884766 0 0 0
0%
2Bhk 59.130001068115234 0 0 0
0%
2Bhk 59.18000030517578 0 0 0
0%
2Bhk 59.459999084472656 0 0 0
0%
2Bhk 59.5 0 0 0
0%
2Bhk 59.54999923706055 0 0 0
0%
2Bhk 59.66999816894531 0 0 0
0%
2Bhk 60.0 0 0 0
0%
2Bhk 60.029998779296875 0 0 0
0%
2Bhk 61.11000061035156 0 0 0
0%
2Bhk 61.18000030517578 0 0 0
0%
2Bhk 61.220001220703125 0 0 0
0%
2Bhk 61.470001220703125 0 0 0
0%
2Bhk 61.790000915527344 0 0 0
0%
2Bhk 61.869998931884766 0 0 0
0%
2Bhk 62.130001068115234 0 0 0
0%
2Bhk 62.13999938964844 0 0 0
0%
2Bhk 62.150001525878906 0 0 0
0%
2Bhk 62.15999984741211 0 0 0
0%
2Bhk 62.25 0 0 0
0%
2Bhk 62.45000076293945 0 0 0
0%
2Bhk 62.52000045776367 0 0 0
0%
2Bhk 63.33000183105469 0 0 0
0%
2Bhk 64.94000244140625 0 0 0
0%
2Bhk 65.4000015258789 0 0 0
0%
2Bhk 67.1500015258789 0 0 0
0%
3Bhk 72.06999969482422 0 0 0
0%
3Bhk 72.08999633789062 0 0 0
0%
3Bhk 72.19999694824219 0 0 0
0%
3Bhk 75.62000274658203 0 0 0
0%
3Bhk 75.79000091552734 0 0 0
0%
3Bhk 75.80999755859375 0 0 0
0%
3Bhk 75.91999816894531 0 0 0
0%
3Bhk 75.98999786376953 0 0 0
0%
3Bhk 78.31999969482422 0 0 0
0%

Viento A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 52.86 1 1 0
100%
2 BHK 56.54 1 1 0
100%
2 BHK 57.6 1 1 0
100%
2 BHK 57.9 8 8 0
100%
2 BHK 58.42 7 7 0
100%
2 BHK 59.18 1 1 0
100%
2 BHK 59.46 1 0 1
0%
2 BHK 59.5 8 8 0
100%
2 BHK 60.0 1 0 1
0%
2 BHK 60.03 8 8 0
100%
2 BHK 61.11 1 0 1
0%
2 BHK 61.47 2 2 0
100%
2 BHK 61.79 15 15 0
100%
2 BHK 61.87 1 1 0
100%
2 BHK 62.13 25 25 0
100%
2 BHK 62.14 3 3 0
100%
2 BHK 62.15 7 7 0
100%
2 BHK 62.16 13 13 0
100%
2 BHK 62.25 2 2 0
100%

Viento B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 56.54 2 2 0
100%
2 BHK 57.9 7 7 0
100%
2 BHK 57.97 2 2 0
100%
2 BHK 58.42 7 7 0
100%
2 BHK 58.44 1 1 0
100%
2 BHK 59.12 1 0 1
0%
2 BHK 59.18 1 1 0
100%
2 BHK 59.5 8 8 0
100%
2 BHK 60.03 8 8 0
100%
2 BHK 61.11 1 0 1
0%
2 BHK 61.47 2 2 0
100%
2 BHK 61.79 15 15 0
100%
2 BHK 61.87 1 1 0
100%
2 BHK 62.13 28 28 0
100%
2 BHK 62.15 5 5 0
100%
2 BHK 62.16 15 15 0
100%
2 BHK 62.45 2 2 0
100%

Viento C

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 43.77 1 0 1
0%
1 BHK 43.8 1 0 1
0%
2 BHK 65.4 1 1 0
100%
2 BHK 67.15 1 0 1
0%
3 BHK 72.07 13 13 0
100%
3 BHK 72.09 3 3 0
100%
3 BHK 72.2 16 16 0
100%
3 BHK 75.62 1 1 0
100%
3 BHK 75.79 14 14 0
100%
3 BHK 75.81 1 1 0
100%
3 BHK 75.92 14 14 0
100%
3 BHK 75.99 1 1 0
100%
3 BHK 78.32 1 0 1
0%

Viento D

Type Carpet (sq.ft) Total Booked Available Status
1RK 29.15 1 0 1
0%
2 BHK 52.86 1 1 0
100%
2 BHK 54.74 1 0 1
0%
2 BHK 57.9 5 5 0
100%
2 BHK 57.97 2 2 0
100%
2 BHK 58.42 7 7 0
100%
2 BHK 59.13 1 0 1
0%
2 BHK 59.18 1 1 0
100%
2 BHK 59.46 1 0 1
0%
2 BHK 59.5 6 6 0
100%
2 BHK 59.55 2 2 0
100%
2 BHK 59.67 1 0 1
0%
2 BHK 60.0 1 0 1
0%
2 BHK 60.03 7 7 0
100%
2 BHK 61.18 1 0 1
0%
2 BHK 61.22 1 1 0
100%
2 BHK 61.79 15 15 0
100%
2 BHK 61.87 1 1 0
100%
2 BHK 62.13 28 28 0
100%
2 BHK 62.15 1 1 0
100%
2 BHK 62.16 14 14 0
100%
2 BHK 62.25 1 1 0
100%
2 BHK 62.45 1 1 0
100%
2 BHK 62.52 1 1 0
100%
2 BHK 63.33 1 0 1
0%
2 BHK 64.94 1 0 1
0%

Construction Progress

VIENTO A

Basement (if any)100%

Viento A

Excavation100%

VIENTO A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Viento A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

VIENTO A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Viento A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

VIENTO A

Plinth100%
Podiums (if any) 0%

Viento A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

VIENTO A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Viento A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

VIENTO A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Viento A

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

VIENTO B

Basement (if any)100%

Viento B

Excavation100%

VIENTO B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Viento B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

VIENTO B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Viento B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

VIENTO B

Plinth100%
Podiums (if any) 0%

Viento B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

VIENTO B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Viento B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

VIENTO B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Viento B

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

VIENTO C

Basement (if any)100%

Viento C

Excavation100%

VIENTO C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Viento C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

VIENTO C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Viento C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

VIENTO C

Plinth100%
Podiums (if any) 0%

Viento C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

VIENTO C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Viento C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

VIENTO C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Viento C

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

VIENTO D

Basement (if any)100%

Viento D

Excavation100%

VIENTO D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Viento D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

VIENTO D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Viento D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

VIENTO D

Plinth100%
Podiums (if any) 0%

Viento D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

VIENTO D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Viento D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

VIENTO D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Viento D

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Clubhouse 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Sports Complex 100%
Storm Water Drains 100%
Street Lighting 100%
Temple 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Woodland Park 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.