📞 +91 98200 30685 ✉️
RERA: A51800043517

Runwal Pinnacle

by Runwal Enterprises Limited Company
Certificate Signed P51800021322
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800021322
Registration No.
REA51800057624
Registration Date
2021-09-08
Developer
Runwal Enterprises Limited Company
Proposed Possession
2026-06-30
Revised Possession
1900-01-01
Extended Possession
2027-06-30
Units Sold
0
Buildings
5
Project Area
4925.58 sq.m
Total FSI
78152.28
Approved FSI
38465.08
MahaRERA QR
Runwal Pinnacle
MahaRERA — P51800021322
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors57
Sanctioned57
🅿️Closed Parking114
📅Completion2025-06-30
🏗️Proposed Floors57
Sanctioned57
🅿️Closed Parking139
📅Completion2025-06-30
🏗️Proposed Floors57
Sanctioned57
🅿️Closed Parking95
📅Completion2025-06-30
🏗️Proposed Floors57
Sanctioned57
🅿️Closed Parking111
📅Completion2025-06-30
🏗️Proposed Floors57
Sanctioned57
🅿️Closed Parking82
📅Completion2025-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 46.630001068115234 0 0 0
0%
1 Bhk Plus Deck 42.959999084472656 0 0 0
0%
1.5 Bhk Plus Deck 43.400001525878906 0 0 0
0%
1Bhk 42.47999954223633 0 0 0
0%
1Bhk 42.849998474121094 0 0 0
0%
1Bhk 42.91999816894531 0 0 0
0%
2 Bhk 54.630001068115234 0 0 0
0%
2 Bhk 59.02000045776367 0 0 0
0%
2 Bhk 59.459999084472656 0 0 0
0%
2 Bhk Plus Deck 55.529998779296875 0 0 0
0%
2 Bhk Plus Deck 56.13999938964844 0 0 0
0%
2 Bhk Plus Deck 61.16999816894531 0 0 0
0%
2 Bhk Plus Deck 61.650001525878906 0 0 0
0%
2Bhk 54.939998626708984 0 0 0
0%
2Bhk 55.38999938964844 0 0 0
0%
2Bhk 60.52000045776367 0 0 0
0%
2Bhk 61.13999938964844 0 0 0
0%
2Bhk 61.16999816894531 0 0 0
0%
2Bhk 61.540000915527344 0 0 0
0%
2Bhk 63.5 0 0 0
0%
2Bhk 63.63999938964844 0 0 0
0%
2Bhk 64.05000305175781 0 0 0
0%
3 Bhk 77.91999816894531 0 0 0
0%
3 Bhk Plus Deck 80.47000122070312 0 0 0
0%
3Bhk 76.11000061035156 0 0 0
0%
3Bhk 79.5199966430664 0 0 0
0%
3Bhk 79.97000122070312 0 0 0
0%
3Bhk 83.98999786376953 0 0 0
0%
3Bhk 87.56999969482422 0 0 0
0%
Studio 34.88999938964844 0 0 0
0%

Tower 1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 61.17 40 39 1
98%
2 BHK plus Deck 61.65 14 0 14
0%
3 BHK 77.92 54 32 22
59%
3 BHK 79.97 54 18 36
33%
3 BHK 83.99 46 31 15
67%
Studio 34.89 1 0 1
0%

Tower 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.48 54 22 32
41%
1 BHK 42.85 54 32 22
59%
2 BHK 54.63 33 25 8
76%
2 BHK 54.94 28 28 0
100%
2 BHK 59.02 21 0 21
0%
2 BHK 59.46 33 29 4
88%
2 BHK 61.54 36 7 29
19%
2 BHK 64.05 21 13 8
62%
2 BHK plus Deck 55.53 12 5 7
42%

Tower 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.48 40 24 16
60%
1 BHK 42.92 40 23 17
57%
1 BHK plus Deck 42.96 14 2 12
14%
1.5 BHK plus Deck 43.4 14 2 12
14%
2 BHK 55.39 28 28 0
100%
2 BHK plus Deck 56.14 12 6 6
50%
2.5 BHK 63.5 36 34 2
94%

Tower 4

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 46.63 54 32 22
59%
2 BHK 63.64 36 30 6
83%
3 BHK 79.52 28 26 2
93%
3 BHK 87.57 54 36 18
67%
3 BHK plus Deck 80.47 12 3 9
25%

Tower 5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 42.48 54 25 29
46%
1 BHK 42.85 54 25 29
46%
2 BHK 60.52 28 27 1
96%
2 BHK 61.14 36 2 34
6%
2 BHK plus Deck 61.17 12 1 11
8%
3 BHK 76.11 54 22 32
41%

Construction Progress

Tower 1

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 80%

Tower 2

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 80%

Tower 3

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.2%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 80%

Tower 4

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.1%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure77%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 80%

Tower 5

Basement (if any)80%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 85%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 80%

RERA Registered Amenities

2 Level Gymnasium
5 level Common Basement
9 level Common Podium
Aerobics Room
Aggregate area of recreational Open Space
BADMINTON COURT Open
Billiards/Pool Room
Business Centre
CCTV surveillance
Common Parking
Community Buildings
Convenience Retail
Creche
DG Backup in Essential & Common Areas
Double height entrance lobbies
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Exclusive kids pool
Fire Protection And Fire Safety Requirements
Gaming Arena
Half-Basketball Court
High Speed lifts
Intercom facility from Lobby to apartment
Jacuzzi
Kids Play Area
Landscaped driveway
Landscaping & Tree Planting
Library
Mini Theatre
Open Parking
Party Hall
Rainwater harvesting
RFID Tagged Entry Systems
Rooftop jogging track
Rooftop Sky Lounge
Sewage Treatment Plant
Sewerage (Chamber, Lines, Septic Tank , STP)
Sky Bbq Pavilion
Sky Deck Open Gym
Solid Waste Management And Disposal
Spa
Squash Court
Stargazing Deck with telescope
Storm Water Drains
Street Lighting
Swimming pool with poolside decks
Table Tennis
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Wifi Enabled Lobbies
Yoga Room
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.