šŸ“ž +91 98200 30685āœ‰ļø
RERA: A51800043517

The Sanctuary

by Runwal Construction Private Limited Company
Certificate SignedP51800012621
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51800012621
Registration No.
REA51800018303
Registration Date
2024-04-03
Developer
Runwal Construction Private Limited Company
Architect
Ninad
Project Bank
HDFC BANK
Proposed Possession
2028-07-31
Revised Possession
2028-07-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
5
Project Area
24406.20 sq.m
Total FSI
82803.32
Approved FSI
26231.43
MahaRERA QR
The Sanctuary
MahaRERA — P51800012621
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors29
āœ…Sanctioned29
ā¬‡ļøBasements3
šŸ…æļøClosed Parking90
šŸ“…Completion2028-01-31
šŸ—ļøProposed Floors28
āœ…Sanctioned28
ā¬‡ļøBasements3
šŸ…æļøClosed Parking50
šŸ“…Completion1900-01-01
šŸ—ļøProposed Floors29
āœ…Sanctioned29
ā¬‡ļøBasements3
šŸ…æļøClosed Parking90
šŸ“…Completion2028-01-31
šŸ—ļøProposed Floors78
āœ…Sanctioned78
ā¬‡ļøBasements3
šŸ…æļøClosed Parking500
šŸ“…Completion1900-01-01
šŸ—ļøProposed Floors78
āœ…Sanctioned78
ā¬‡ļøBasements3
šŸ…æļøClosed Parking670
šŸ“…Completion1900-01-01

Apartment Configurations

Tower 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK30.9101
0%
2 BHK71.3124204
83%
3 BHK77.1124195
79%
3 BHK77.9124213
88%
3 BHK98.2521147
67%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK64.57843351
39%
2 BHK84.89101
0%

Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK30.9101
0%
2 BHK71.3124195
79%
3 BHK77.1124915
38%
3 BHK77.91241410
58%
3 BHK98.2521183
86%

Tower 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.321290129
0%
2 BHK56.091290129
0%
2.5 BHK72.11380138
0%

Tower 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.3269069
0%
2 BHK56.0969069
0%
3 BHK86.460060
0%
3 BHK87.169069
0%
4 BHK132.5169069
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Rk30.899999618530273000
0%
2 Bhk55.31999969482422000
0%
2 Bhk56.09000015258789000
0%
2 Bhk64.56999969482422000
0%
2 Bhk84.88999938964844000
0%
2.5 Bhk72.0999984741211000
0%
2Bhk71.30999755859375000
0%
3 Bhk86.4000015258789000
0%
3 Bhk87.0999984741211000
0%
3Bhk77.11000061035156000
0%
3Bhk77.91000366210938000
0%
3Bhk98.25000
0%
4 Bhk132.50999450683594000
0%

Construction Progress

Tower 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Tower 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises69%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure89%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.65%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure80%

Tower 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Tower 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing55%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.71%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing5%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure74%

Tower 5

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing25%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
āœ…Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station20%
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements
āœ…Landscaping & Tree Planting5%
⬜Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)30%
āœ…Solid Waste Management And Disposal
āœ…Storm Water Drains15%
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water
āœ…Water Conservation, Rain water Harvesting10%
āœ…Water Supply25%
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now