📞 +91 98200 30685 ✉️
RERA: A51800043517

SAYBA ELYSIA

by SAYBA HOME MAKERS Partnership
Certificate Signed P51800078321
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800078321
Registration No.
REA51800164371
Registration Date
2024-12-04
Developer
SAYBA HOME MAKERS Partnership
Architect
Kaushal
Project Bank
PUNJAB NATIONAL BANK
Proposed Possession
2027-07-31
Total Units
326
Units Sold
36 (11%)
Project Area
2224.09 sq.m
Total FSI
13065.25
Approved FSI
13065.25
MahaRERA QR
SAYBA ELYSIA
MahaRERA — P51800078321
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🏠Habitable15
🔢Total Units124
🏡Residential119
🏢Non-Residential5
⬇️Basements1
🅿️Closed Parking28
📅Completion2027-12-31
🏗️Proposed Floors16
Sanctioned16
🏠Habitable15
🔢Total Units202
🏡Residential190
🏢Non-Residential12
⬇️Basements1
🅿️Closed Parking27
📅Completion2027-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 34.459999084472656 0 0 0
0%
1Bhk 36.81999969482422 0 0 0
0%
1Bhk 36.84000015258789 0 0 0
0%
1Bhk 37.47999954223633 0 0 0
0%
1Bhk 38.540000915527344 0 0 0
0%
1Bhk 38.75 0 0 0
0%
1Bhk 39.369998931884766 0 0 0
0%
1Bhk 39.40999984741211 0 0 0
0%
1Bhk 41.529998779296875 0 0 0
0%
2Bhk 67.69000244140625 0 0 0
0%
Mpr Flat Sale 13.029999732971191 0 0 0
0%
Mpr Flat Sale 14.949999809265137 0 0 0
0%
Nursing Home 339.17999267578125 0 0 0
0%
Rehab 1Bhk 29.8799991607666 0 0 0
0%
Rehab 1Bhk 30.510000228881836 0 0 0
0%
Rehab 1Bhk 33.02000045776367 0 0 0
0%
Rehab 1Bhk 33.650001525878906 0 0 0
0%
Rehab 1Bhk 33.91999816894531 0 0 0
0%
Rehab 1Bhk 34.5099983215332 0 0 0
0%
Rehab 1Bhk 36.84000015258789 0 0 0
0%
Rehab 1Bhk 47.91999816894531 0 0 0
0%
Rehab Shop 7.840000152587891 0 0 0
0%
Rehab Shop 10.529999732971191 0 0 0
0%
Rehab Shop 11.260000228881836 0 0 0
0%
Rehab Shop 12.25 0 0 0
0%
Rehab Shop 13.90999984741211 0 0 0
0%
Rehab Shop 17.1299991607666 0 0 0
0%
Rehab Shop 18.899999618530273 0 0 0
0%
Rehab Shop 21.690000534057617 0 0 0
0%
Rehab Stall 0.8999999761581421 0 0 0
0%
Rehab Stall 1.940000057220459 0 0 0
0%
Rehab Stall 3.299999952316284 0 0 0
0%
Shop 224.3000030517578 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.46 12 0 12
0%
1 BHK 36.82 11 0 11
0%
1 BHK 36.84 1 0 1
0%
1 BHK 37.48 12 0 12
0%
1 BHK 38.54 12 0 12
0%
1 BHK 38.75 11 0 11
0%
1 BHK 39.37 11 0 11
0%
1 BHK 39.41 23 0 23
0%
1 BHK 41.53 11 0 11
0%
2 BHK 67.69 1 0 1
0%
ExistingTenantFlat 36.84 1 0 1
0%
ExistingTenantFlat 47.92 13 0 13
0%
ExistingTenantShop 17.13 1 0 1
0%
ExistingTenantShop 18.9 1 0 1
0%
ExistingTenantShop 21.69 1 0 1
0%
Nursing Home 339.18 1 0 1
0%
Shop 219.8 1 0 1
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
Existing Stall 0.9 1 0 1
0%
Existing Stall 1.94 3 0 3
0%
Existing stall 3.3 1 0 1
0%
Existing tenant Shop 7.84 1 0 1
0%
Existing tenant shop 10.53 1 0 1
0%
Existing tenant shop 11.26 1 0 1
0%
Existing tenant shop 12.25 1 0 1
0%
Existing Tenant Shop 13.91 1 0 1
0%
ExistingTenantFlat 29.88 117 0 117
0%
ExistingTenantFlat 30.51 13 0 13
0%
ExistingTenantFlat 33.02 4 0 4
0%
ExistingTenantFlat 33.65 1 0 1
0%
ExistingTenantFlat 33.92 14 0 14
0%
ExistingTenantFlat 34.51 41 0 41
0%
MPR FLAT SALE 13.03 1 0 1
0%
MPR FLAT SALE 14.95 1 0 1
0%

Construction Progress

A WING

Basement (if any)80%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%

A WING

Plinth80%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure5%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

A Wing

Stilt Floor30%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth70%
X number of Podiums0%
X number of Slabs of Super Structure0%

B WING

Basement (if any)80%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%

B WING

Plinth80%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure5%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

B Wing

Stilt Floor80%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth70%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.