Source stage: On-Going Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jun 2008
Revised
Dec 2019
Status
On-Going Project
⚠ Possession revised later than originally proposed — per MahaRERA.
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Sshop258 ft²On request
Shop131–287 ft²On request
1333 ft²On request
1 RK332–350 ft²On request
1.5Bh487 ft²On request
1 BHK302–712 ft²On request
2.5 BHK790–854 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51800011501
Registered
—
Litigation
No reported in source
Escrow Bank
HDFC BANK
Architect
—
Total FSI
5500
04
Buildings · 1 Wing(s)
Tilak Nagar Dayasagar— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Tilak Nagar Station Road
19.068535499999999,72.900320899999997
19.068535499999999,72.900320899999997
▸ Explore map & Street View — for verified buyers
09
Construction Progress
90% avgExcavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
X number of Podiums0%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Aditya Associates
?
Frequently Asked Questions
When is possession of Tilak Nagar Dayasagar?
As per MahaRERA, proposed possession is Jun 2008, revised to Dec 2019.
Is Tilak Nagar Dayasagar RERA-registered?
Yes — MahaRERA registration P51800011501. The current MahaRERA source record reports no litigations.
Who is the developer?
Aditya Associates — 45 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.