Project Information

RERA Certificate No.
P51800001482
Registration No.
REA51800005883
Registration Date
2017-07-28
Developer
Veena Developers Others
Architect
Manish Shah
Project Bank
RBL Bank Limited
Proposed Possession
2019-12-31
Revised Possession
2019-12-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
426.25 sq.m
Total FSI
8106.30
Approved FSI
3498.60
MahaRERA QR
VEENA SANTOOR PHASE II
MahaRERA — P51800001482
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors12
Sanctioned12
🚗Open Parking20
🅿️Closed Parking1
📅Completion2019-12-31
🏗️Proposed Floors12
Sanctioned12
🚗Open Parking20
🅿️Closed Parking1
📅Completion2019-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 39.13999938964844 0 0 0
0%
1 Bhk 39.22999954223633 0 0 0
0%
1Bhk 39.13999938964844 0 0 0
0%

H Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.14 20 20 0
100%
1 BHK 39.23 20 20 0
100%

I Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 39.14 20 20 0
100%
1 BHK 39.23 20 20 0
100%

Construction Progress

H WING

Basement (if any)100%

H Wing

Excavation100%

H WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

H Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

H WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

H Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%

H WING

Plinth100%
Podiums (if any) 0%

H Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

H WING

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

H Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

H WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

H Wing

Stilt Floor75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

I WING

Basement (if any)100%

I Wing

Excavation100%

I WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

I Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

I WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

I Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%

I WING

Plinth100%
Podiums (if any) 0%

I Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises90%

I WING

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

I Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

I WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

I Wing

Stilt Floor75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management
Fire Protection And Fire Safety Requirements 90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 75%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 75%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.