📞 +91 98200 30685 ✉️
RERA: A51800043517

Yogi Sea

by Yogi Limited Company
Certificate Signed P51800050666
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800050666
Registration No.
REA51800130658
Registration Date
2023-04-21
Developer
Yogi Limited Company
Architect
Ark Reza Kabul Architects Pvt. Ltd.
Project Bank
HDFC BANK
Proposed Possession
2025-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
7
Units Sold
1 (14%)
Buildings
1
Project Area
565.20 sq.m
Total FSI
1656.61
Approved FSI
1656.61
MahaRERA QR
Yogi Sea
MahaRERA — P51800050666
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
Sanctioned13
🏠Habitable13
🔢Total Units7
🏡Residential7
⬇️Basements1
🅿️Closed Parking27
📅Completion2025-09-30

Apartment Configurations

Yogi Sea

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 121.23 4 0 4
0%
4 BHK Duplex 185.32 1 0 1
0%
4 BHK Duplex 204.44 1 0 1
0%
4 BHK Duplex 238.96 1 0 1
0%
4 BHK Duplex 242.46 1 0 1
0%

Construction Progress

Yogi Sea

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Plinth1000%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure65%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.