S
✓ MahaRERA P51900030966RERA: no litigation reportedSumit Atulyam
by Sumit Matunga Builders
📍 Mahim, Mumbai City · 400016
43
Units
2024
Possession
2
Buildings
Kept in Abeyance
Status
Completed/historical project — current inventory unconfirmed
Ask an advisor to check current resale or rental availability.
Source stage: Sold Out · mapped resale: 0 · mapped rental: 0 · primary status: recorded
PB
Pooja Batra · Senior Advisor
Mumbai Property Exchange · MahaRERA-registered since 2017
★
Gallery




i
Overview
Sumit Atulyam A new Project by Sumit Group at Matunga. It is a 21 Storey Tower with 2 and 3 BHK configuration. RERA approved project. It has amenities for each and everyone which includes Sauna, Ayurveda Garden, senior citizen pockets, infinity swimming pool, Yoga Deck etc. Also has great connectivity which includes close proximity to the Ruparel College, Shivaji Park, Station, Hospitals.
₹
Matunga — resale, rent & yield
Resale
₹52,014/sqft
median · 15 listings
Rent
₹183.0/sqft/mo
2 BHK ~₹126,000/mo
Gross yield
4.2%/yr
rent vs resale value
This project is quoted around ₹59,050/sqft — 14% above resale here.
From MPE live listings, last 18 months · Mumbai price index ›
01
Possession Timeline
Proposed
Dec 2024
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Additional Mem43–147 ft²₹25 L–₹87 L
2 BHK643–831 ft²₹3.8 Cr–₹4.91 Cr
3 BHK1,141–1,198 ft²₹6.74 Cr–₹7.07 Cr
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51900030966
Registered
—
Litigation
No reported in source
Escrow Bank
HDFC
Architect
—
Total FSI
8791
04
Buildings · 2 Wing(s)
Sumit Atulyam Phase I Wing A Wing And Wing B Upto— floors · — units
Sumit Atulyam Phase Ii - Wing B, 18Th To 21St Flo— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Mahim
▸ Explore map & Street View — for verified buyers
08
Availability & Pricing
TypeCarpetPriceAvail
2 BHK670 ft²₹3.88 Cr—
2 BHK831 ft²₹4.92 Cr—
3 BHK1141 ft²₹6.85 Cr—
09
Construction Progress
77% avgExcavation100%
Stilt Floor100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85%
Overall Percentage of Completion of the work done For the entire Building /Wing82%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing70%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate30%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingStorm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Ask about resale or rental options09
Resale Flats for Sale in Mahim
410
Flats for Rent in Mahim
414
More by Sumit Matunga Builders
15
MahaRERA projects nearby in Mahim
?
Frequently Asked Questions
When is possession of Sumit Atulyam?
As per MahaRERA, proposed possession is Dec 2024.
Is Sumit Atulyam RERA-registered?
Yes — MahaRERA registration P51900030966. The current MahaRERA source record reports no litigations.
What configurations and prices are available?
3 configuration(s), including 2 BHK of 670 sqft at ₹3.88 Cr. See the pricing table above.
Who is the developer?
Sumit Matunga Builders — 27 projects tracked on Mumbai Property Exchange.
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




