📞 +91 98200 30685✉️
RERA: A51800043517

Aaradhya Parkwood 1

by Man Vastucon Llp Others
Certificate SignedP51700046758

Project Information

RERA Certificate No.
P51700046758
Registration No.
REA51700117853
Registration Date
2023-07-16
Developer
Man Vastucon Llp Others
Architect
Disha Design Consultant
Project Bank
INDUSIND BANK
Proposed Possession
2028-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
546
Units Sold
455 (83%)
Buildings
2
Project Area
1237.93 sq.m
Total FSI
39960.08
Approved FSI
39960.08
MahaRERA QR
Aaradhya Parkwood 1
MahaRERA — P51700046758
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors40
Sanctioned40
🏠Habitable35
🔢Total Units273
🏡Residential273
⬇️Basements1
🅿️Closed Parking168
📅Completion2028-12-31
🏗️Proposed Floors40
Sanctioned40
🏠Habitable35
🔢Total Units273
🏡Residential273
⬇️Basements1
🅿️Closed Parking168
📅Completion2028-12-31

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk38.09000015258789000
0%
1Bhk41.9900016784668000
0%
2.5Bhk72.41000366210938000
0%
2Bhk60.38999938964844000
0%
2Bhk60.849998474121094000
0%
2Bhk62.2400016784668000
0%

Tower 3 Clove

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.09704921
70%
1 BHK41.9920317033
84%

Tower 4 Dion

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK60.39351520
43%
2 BHK60.8514011723
84%
2 BHK62.24914150
45%
2.5 BHK72.41761
86%

Construction Progress

TOWER 3 CLOVE

Basement (if any)100%

Tower 3 Clove

Excavation100%

TOWER 3 CLOVE

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 3 Clove

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 3 CLOVE

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%

Tower 3 Clove

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

TOWER 3 CLOVE

Plinth100%
Podiums (if any) 100%

Tower 3 Clove

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER 3 CLOVE

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Tower 3 Clove

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER 3 CLOVE

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower 3 Clove

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure94%

TOWER 4 DION

Basement (if any)100%

Tower 4 Dion

Excavation100%

TOWER 4 DION

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 4 Dion

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 4 DION

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%

Tower 4 Dion

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

TOWER 4 DION

Plinth100%
Podiums (if any) 100%

Tower 4 Dion

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER 4 DION

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Tower 4 Dion

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER 4 DION

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower 4 Dion

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure94%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
NA
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.