📞 +91 98200 30685 ✉️
RERA: A51800043517

Aquaria Grande, Wing B Floor 33-38

by Club Aquaria Enterprises Partnership
Certificate Signed P51800007959
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800007959
Registration No.
REA51800008749
Registration Date
2021-09-10
Developer
Club Aquaria Enterprises Partnership
Architect
Teearch
Project Bank
INDUSIND BANK
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
908.00 sq.m
Total FSI
4361.57
Approved FSI
929.36
MahaRERA QR
Aquaria Grande, Wing B Floor 33-38
MahaRERA — P51800007959
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors7
Sanctioned7
🅿️Closed Parking43
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3 Point 5 Bhk 172.77999877929688 0 0 0
0%
3Bhk 152.25999450683594 0 0 0
0%
4 Bhk 213.47999572753906 0 0 0
0%
4Bhk 202.97000122070312 0 0 0
0%

Wing B Floor 33-38

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 152.26 5 4 1
80%
3 point 5 BHK 172.78 6 1 5
17%
4 BHK 202.97 1 1 0
100%
4 BHK 213.48 5 5 0
100%

Construction Progress

Wing B Floor 33-38

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing60%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 90%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 90%
Energy management 95%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 95%
Open Parking 90%
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal 82%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 90%
Water Conservation, Rain water Harvesting 90%
Water Supply 82%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.