📞 +91 98200 30685 ✉️
RERA: A51800043517

ASHAR METRO TOWERS

by SHREE SAIBABA GRIHANIRMITI PRIVATE LIMITED Company
Certificate Signed P51700007507
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007507
Registration No.
REA51700018614
Registration Date
2021-09-09
Developer
SHREE SAIBABA GRIHANIRMITI PRIVATE LIMITED Company
Architect
Design Consortium Architects India Pvt Ltd
Project Bank
ICICI BANK LIMITED
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
1361.22 sq.m
Total FSI
26737.09
Approved FSI
15672.49
MahaRERA QR
ASHAR METRO TOWERS
MahaRERA — P51700007507
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors32
Sanctioned32
⬇️Basements1
🅿️Closed Parking179
📅Completion2023-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 36.68000030517578 0 0 0
0%
1Bhk 36.88999938964844 0 0 0
0%
1Bhk 36.91999816894531 0 0 0
0%
1Bhk 37.02000045776367 0 0 0
0%
1Bhk 41.83000183105469 0 0 0
0%
2Bhk 41.5 0 0 0
0%
2Bhk 41.689998626708984 0 0 0
0%
2Bhk 41.779998779296875 0 0 0
0%
2Bhk 42.029998779296875 0 0 0
0%
2Bhk 42.09000015258789 0 0 0
0%
2Bhk 42.150001525878906 0 0 0
0%
2Bhk 42.189998626708984 0 0 0
0%
2Bhk 42.2599983215332 0 0 0
0%
2Bhk 42.33000183105469 0 0 0
0%
2Bhk 42.400001525878906 0 0 0
0%
2Bhk 45.09000015258789 0 0 0
0%
2Bhk 45.16999816894531 0 0 0
0%
2Bhk 45.189998626708984 0 0 0
0%
2Bhk 45.2400016784668 0 0 0
0%

Ashar Metro Towers A And B Wing

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.68 22 22 0
100%
1 BHK 36.89 51 51 0
100%
1 BHK 36.92 12 12 0
100%
1 BHK 37.02 14 14 0
100%
1 BHK 41.83 8 8 0
100%
2 BHK 41.5 1 1 0
100%
2 BHK 41.69 1 1 0
100%
2 BHK 41.78 1 0 1
0%
2 BHK 42.03 9 8 1
89%
2 BHK 42.09 9 8 1
89%
2 BHK 42.15 2 2 0
100%
2 BHK 42.19 12 9 3
75%
2 BHK 42.26 12 10 2
83%
2 BHK 42.33 19 17 2
89%
2 BHK 42.4 1 1 0
100%
2 BHK 45.09 4 3 1
75%
2 BHK 45.17 43 43 0
100%
2 BHK 45.19 1 1 0
100%
2 BHK 45.24 7 7 0
100%

Construction Progress

ASHAR METRO TOWERS A AND B WING

Basement (if any)80%

Ashar Metro Towers A And B Wing

Excavation100%

ASHAR METRO TOWERS A AND B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%

Ashar Metro Towers A And B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%

ASHAR METRO TOWERS A AND B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

Ashar Metro Towers A And B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%
Overall Percentage of Completion of the work done For the entire Building /Wing64%

ASHAR METRO TOWERS A AND B WING

Plinth80%
Podiums (if any) 0%

Ashar Metro Towers A And B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%

ASHAR METRO TOWERS A AND B WING

Sanitary Fittings within the flats / premises60%
Slabs of Super Structure90%

Ashar Metro Towers A And B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%

ASHAR METRO TOWERS A AND B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

Ashar Metro Towers A And B Wing

Stilt Floor60%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth80%
X number of Podiums0%
X number of Slabs of Super Structure90%

RERA Registered Amenities

Aggregate area of recreational Open Space
BARBEQUE AREA WITH PARTY DECK
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
FLOWER GARDEN
JOGGING TRACK
Landscaping & Tree Planting
OPEN AIR GYM
Open Parking
REFLEXOLOGY PATH
SENIOR CITIZENS CORNER
Sewerage (Chamber, Lines, Septic Tank , STP)
SKATING RINK
SKY LOUNGE AREA
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
SUN DECK
Treatment And Disposal Of Sewage And Sullage Water
TURF NET CRICKET
Water Conservation, Rain water Harvesting
Water Supply
YOGA AND MEDITATION DECK
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.