📞 +91 98200 30685 ✉️
RERA: A51800043517

Ambrosia and Aster

by Jangid Properties Partnership
Certificate Signed P51700007248
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700007248
Registration No.
REA51700013575
Registration Date
2017-08-17
Developer
Jangid Properties Partnership
Architect
Tejs Architect And Consultants
Project Bank
ICICI BANK LIMITED
Proposed Possession
2019-04-30
Revised Possession
2019-04-30
Extended Possession
2020-10-29
Units Sold
0
Buildings
2
Project Area
3250.00 sq.m
Total FSI
11907.62
Approved FSI
10407.62
MahaRERA QR
Ambrosia and Aster
MahaRERA — P51700007248
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
🅿️Closed Parking34
📅Completion1900-01-01
🏗️Proposed Floors20
Sanctioned20
🅿️Closed Parking33
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 68.4000015258789 0 0 0
0%
3 Bhk 84.44999694824219 0 0 0
0%
4 Bhk 165.27999877929688 0 0 0
0%
Shop 19.709999084472656 0 0 0
0%
Shop 20.799999237060547 0 0 0
0%
Shop 21.829999923706055 0 0 0
0%
Shop 23.200000762939453 0 0 0
0%
Shop 24.90999984741211 0 0 0
0%
Shop 26.799999237060547 0 0 0
0%
Shop 29.09000015258789 0 0 0
0%
Shop 68.7699966430664 0 0 0
0%
Shop 70.5999984741211 0 0 0
0%
Shop 71.5999984741211 0 0 0
0%
Shop 72.5999984741211 0 0 0
0%
Shop 75.41000366210938 0 0 0
0%
Shop 99.02999877929688 0 0 0
0%

Ambrosia

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 68.4 38 38 0
100%
3 BHK 84.45 20 20 0
100%
4 BHK 165.28 2 2 0
100%
Shop 19.71 2 2 0
100%
Shop 20.8 1 1 0
100%
Shop 21.83 2 2 0
100%
Shop 23.2 1 1 0
100%
Shop 24.91 2 2 0
100%
Shop 26.8 10 10 0
100%
Shop 29.09 2 2 0
100%
Shop 68.77 1 0 1
0%
Shop 99.03 1 0 1
0%

Aster

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 68.4 45 45 0
100%
3 BHK 84.45 24 24 0
100%
4 BHK 165.28 2 2 0
100%
Shop 19.71 2 2 0
100%
Shop 20.8 1 1 0
100%
Shop 21.83 2 2 0
100%
Shop 23.2 1 1 0
100%
Shop 24.91 2 2 0
100%
Shop 29.09 2 2 0
100%
Shop 70.6 1 1 0
100%
Shop 71.6 1 1 0
100%
Shop 72.6 1 1 0
100%
Shop 75.41 1 0 1
0%

Construction Progress

Ambrosia

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure92%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure92%

Aster

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure92%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure92%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 75%
Energy management
Fire Protection And Fire Safety Requirements 40%
Landscaping & Tree Planting
Open Parking 75%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.