BHUMIRAJ HILLS

by BHUMIRAJ BUILDERS PVT.LTD. Company
Certificate Signed P51700016926
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700016926
Registration No.
REA51700039728
Registration Date
2024-01-31
Developer
BHUMIRAJ BUILDERS PVT.LTD. Company
Project Bank
HDFC BANK
Proposed Possession
2023-05-31
Revised Possession
1900-01-01
Extended Possession
2027-12-31
Total Units
75
Units Sold
5 (7%)
Buildings
2
Project Area
2597.99 sq.m
Total FSI
79800.00
Approved FSI
2841.00
MahaRERA QR
BHUMIRAJ HILLS
MahaRERA — P51700016926
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
🏠Habitable10
🔢Total Units43
🏡Residential39
🏢Non-Residential4
🅿️Closed Parking1
📅Completion2023-05-31
🏗️Proposed Floors11
Sanctioned11
🏠Habitable10
🔢Total Units32
🏡Residential32
🅿️Closed Parking1
📅Completion2023-05-31

Apartment Configurations

Tower 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.46 6 0 6
0%
1 BHK 32.95 3 0 3
0%
1 BHK 36.1 3 0 3
0%
1 BHK TERRACE 27.34 2 0 2
0%
1 BHK TERRACE 27.62 4 0 4
0%
1 BHK TERRACE 33.11 2 0 2
0%
1 BHK TERRACE 36.26 2 0 2
0%
2 BHK 40.89 6 1 5
17%
2 BHK 46.38 8 1 7
12%
2 BHK TERRACE 40.89 2 0 2
0%
2 BHK TERRACE 43.48 1 1 0
100%

Tower 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 27.7 6 0 6
0%
1 BHK 30.18 2 0 2
0%
1 BHK With Terrace 27.85 6 0 6
0%
1 BHK With Terrace 30.33 2 0 2
0%
2 BHK 40.19 16 2 14
12%

Construction Progress

TOWER 2

Basement (if any)100%

Tower 2

Excavation100%

TOWER 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%

Tower 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%

Tower 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises5%

TOWER 2

Plinth100%
Podiums (if any) 0%

Tower 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises2%

TOWER 2

Sanitary Fittings within the flats / premises2%
Slabs of Super Structure81%

Tower 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.51%

TOWER 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%

Tower 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure45%

TOWER 3

Basement (if any)100%

Tower 3

Excavation100%

TOWER 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%

Tower 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%

Tower 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises20%

TOWER 3

Plinth100%
Podiums (if any) 0%

Tower 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure88%

Tower 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.85%

TOWER 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%

Tower 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing25%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure88%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.