List PropertyWhatsApp
Best DealsNew Projects๐Ÿ—บ๏ธ Projects MapBuy a FlatRent a FlatCommercialBuilders & DevelopersWhy UsRERA SearchLocalitiesTools & CalculatorsNRI HubNews+ List Your Property๐Ÿ’ฌ WhatsApp Us
Mumbai property advisory & dataOperating since 1995โœ“ MahaRERA A51800043517Source-labelled project dataWe reply in minutes on WhatsApp

Bitcon Elysium

by Bitcon India Infrastructure Developers Private Limited Company
Certificate SignedP51800055839
Want us to WhatsApp you? Enter your mobile — we’ll say hello and take it from there.
+91

Project Information

RERA Certificate No.
P51800055839
Registration No.
REA51800153225
Registration Date
2024-05-21
Developer
Bitcon India Infrastructure Developers Private Limited Company
Architect
Manish Shah
Project Bank
UNION BANK OF INDIA
Proposed Possession
2029-05-31
Total Units
241
Units Sold
31 (13%)
Buildings
3
Project Area
3566.00 sq.m
Total FSI
12981.72
Approved FSI
6795.72
MahaRERA QR
Bitcon Elysium
MahaRERA โ€” P51800055839
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ Habitable17
๐Ÿ”ขTotal Units74
๐ŸกResidential70
๐ŸขNon-Residential4
๐Ÿ—๏ธProposed Floors31
โœ…Sanctioned31
๐Ÿ Habitable23
๐Ÿ”ขTotal Units84
๐ŸกResidential75
๐ŸขNon-Residential9
๐Ÿ—๏ธProposed Floors17
โœ…Sanctioned17
๐Ÿ Habitable17
๐Ÿ”ขTotal Units83
๐ŸกResidential77
๐ŸขNon-Residential6

Apartment Configurations

BITCON ELYSIUM WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK39.99707
0%
2BHK57.83101
0%
2BHK60.29707
0%
SHOP 119.17101
0%
SHOP 1A15.95101
0%
SHOP 222.18101
0%
SHOP 320.39101
0%

BITCON ELYSIUM WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK39.9320317
15%
1BHK40.7114014
0%
1BHK40.8220218
10%
2BHK59.5520317
15%
3BHK87.47101
0%
SHOP NO 1017.95101
0%
SHOP NO 119.94101
0%
SHOP NO 1214.29101
0%
SHOP NO 1315.06101
0%
SHOP NO 1412.29101
0%
SHOP NO 410.93101
0%
SHOP NO 514.69101
0%
SHOP NO 616.9101
0%
SHOP NO 714.6101
0%
SHOP NO 817.8101
0%
SHOP NO 915.13101
0%

BITCON ELYSIUM WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2BHK59.0707
0%
2BHK59.83707
0%
3BHK75.22808
0%
SHOP NO 1520.14101
0%
SHOP NO 1622.14101
0%
SHOP NO 1718.36101
0%
SHOP NO 1815.69101
0%

Construction Progress

BITCON ELYSIUM WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BITCON ELYSIUM WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

BITCON ELYSIUM WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station
โฌœEnergy managemcnt
โœ…Fire protection and fire safety requirements
โฌœInternal Roads & Footpaths
โœ…Landscaping & Tree Planting
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains
โฌœStreet Lighting
โฌœTreatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting

Latest Mumbai Property News

View all news โ†’
CallWhatsApp
๐Ÿ‘‹ Looking for the right project? Let me help you find it!
๐Ÿ—๏ธ
MPE Project Advisor
โ— Online now