📞 +91 98200 30685 ✉️
RERA: A51800043517

CHANDAK VANSHAM

by CHANDAK REALTORS PRIVATE LIMITED Company
Certificate Signed P51800080145
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800080145
Registration No.
REA51800168538
Registration Date
2025-04-30
Developer
CHANDAK REALTORS PRIVATE LIMITED Company
Architect
Yms Consultants Ltd
Project Bank
RBL Bank Limited
Proposed Possession
2031-12-31
Total Units
525
Units Sold
0 (0%)
Project Area
5150.09 sq.m
Total FSI
66513.70
Approved FSI
60282.77
MahaRERA QR
CHANDAK VANSHAM
MahaRERA — P51800080145
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors26
Sanctioned26
🏠Habitable17
🔢Total Units42
🏡Residential42
🏗️Proposed Floors26
Sanctioned26
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors26
Sanctioned26
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors26
Sanctioned26
🏠Habitable17
🔢Total Units56
🏡Residential56
🏗️Proposed Floors26
Sanctioned26
🏠Habitable17
🔢Total Units52
🏡Residential52
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units27
🏡Residential27
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units56
🏡Residential56
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units28
🏡Residential28
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units41
🏡Residential41
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units42
🏡Residential42
🏗️Proposed Floors22
Sanctioned22
🏠Habitable17
🔢Total Units41
🏡Residential41

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 44.52000045776367 0 0 0
0%
2Bhk 46.61000061035156 0 0 0
0%
2Bhk 69.37000274658203 0 0 0
0%
2Bhk 69.98999786376953 0 0 0
0%
2Bhk 70.6500015258789 0 0 0
0%
2Bhk 71.26000213623047 0 0 0
0%
2Bhk 74.95999908447266 0 0 0
0%
2Bhk 75.05999755859375 0 0 0
0%
2Bhk 77.66000366210938 0 0 0
0%
2Bhk 97.02999877929688 0 0 0
0%
2Bhk 99.75 0 0 0
0%
2Bhk 110.9000015258789 0 0 0
0%
2Bhk Rehab 44.2599983215332 0 0 0
0%
2Bhk Rehab 44.52000045776367 0 0 0
0%
2Bhk Rehab 46.61000061035156 0 0 0
0%
2Bhk Rehab 49.40999984741211 0 0 0
0%
2Bhk Rehab 55.22999954223633 0 0 0
0%
2Bhk Rehab 68.58000183105469 0 0 0
0%
2Bhk Rehab 69.30999755859375 0 0 0
0%
2Bhk Rehab 69.37000274658203 0 0 0
0%
2Bhk Rehab 69.98999786376953 0 0 0
0%
2Bhk Rehab 74.95999908447266 0 0 0
0%
2Bhk Rehab 75.05999755859375 0 0 0
0%
2Bhk Rehab 112.11000061035156 0 0 0
0%
3Bhk 86.72000122070312 0 0 0
0%
3Bhk 93.29000091552734 0 0 0
0%
3Bhk 94.62000274658203 0 0 0
0%
3Bhk 96.54000091552734 0 0 0
0%
3Bhk 96.61000061035156 0 0 0
0%
3Bhk 96.66999816894531 0 0 0
0%
3Bhk 97.29000091552734 0 0 0
0%
3Bhk 109.94000244140625 0 0 0
0%
3Bhk 110.25 0 0 0
0%
3Bhk 110.36000061035156 0 0 0
0%
3Bhk 111.48999786376953 0 0 0
0%
3Bhk 112.27999877929688 0 0 0
0%
3Bhk 114.87999725341797 0 0 0
0%
3Bhk 114.98999786376953 0 0 0
0%
3Bhk Rehab 86.72000122070312 0 0 0
0%
3Bhk Rehab 87.2699966430664 0 0 0
0%
3Bhk Rehab 87.43000030517578 0 0 0
0%
3Bhk Rehab 87.5 0 0 0
0%
3Bhk Rehab 88.16999816894531 0 0 0
0%
3Bhk Rehab 88.23999786376953 0 0 0
0%
3Bhk Rehab 93.29000091552734 0 0 0
0%
3Bhk Rehab 94.61000061035156 0 0 0
0%
3Bhk Rehab 94.62000274658203 0 0 0
0%
3Bhk Rehab 95.83000183105469 0 0 0
0%
3Bhk Rehab 96.30999755859375 0 0 0
0%
3Bhk Rehab 96.54000091552734 0 0 0
0%
3Bhk Rehab 96.66999816894531 0 0 0
0%
3Bhk Rehab 97.29000091552734 0 0 0
0%
3Bhk Rehab 109.94000244140625 0 0 0
0%
3Bhk Rehab 110.25 0 0 0
0%
3Bhk Rehab 110.36000061035156 0 0 0
0%
3Bhk Rehab 111.48999786376953 0 0 0
0%
3Bhk Rehab 112.27999877929688 0 0 0
0%
3Bhk Rehab 114.87999725341797 0 0 0
0%
4Bhk 153.3300018310547 0 0 0
0%
4Bhk 154.3000030517578 0 0 0
0%
4Bhk 154.4199981689453 0 0 0
0%
4Bhk 159.9199981689453 0 0 0
0%
4Bhk Rehab 153.3300018310547 0 0 0
0%
Residential Store Ro 19.549999237060547 0 0 0
0%

Construction Progress

PLOT A Tower 1

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT A Tower 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT A Tower 3

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT A Tower 4

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT A Tower 5

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 1

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 2

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 3

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 4

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 5

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 6

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 7

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 8A

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%

PLOT B Tower 8B

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.