Basement (if any)100%
Excavation100%
Plinth100%
Slabs of Super Structure100%
Stilt Floor100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
Overall Percentage of Completion of the work done For the entire Building /Wing78%