Project Information

RERA Certificate No.
P51900032067
Registration No.
REA51900097190
Registration Date
2024-08-02
Developer
Dosti Realty Ltd Company
Project Bank
HDFC BANK
Proposed Possession
2027-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
377
Units Sold
354 (94%)
Buildings
2
Project Area
1160.92 sq.m
Total FSI
39229.36
Approved FSI
36375.76
MahaRERA QR
Dosti Eastern Bay - Phase 3
MahaRERA — P51900032067
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors49
Sanctioned49
🏠Habitable49
🔢Total Units170
🏡Residential170
⬇️Basements3
🅿️Closed Parking169
📅Completion2027-09-30
🏗️Proposed Floors49
Sanctioned49
🔢Total Units207
🏡Residential207
⬇️Basements3
🅿️Closed Parking381
📅Completion2027-09-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Rk 43.47999954223633 0 0 0
0%
2Bhk 63.72999954223633 0 0 0
0%
2Bhk 63.970001220703125 0 0 0
0%
2Bhk 65.1500015258789 0 0 0
0%
2Bhk 65.77999877929688 0 0 0
0%
2Bhk 66.01000213623047 0 0 0
0%
2Bhk 66.33000183105469 0 0 0
0%
2Bhk 67.69999694824219 0 0 0
0%
2Bhk 67.87999725341797 0 0 0
0%
3Bhk 88.05999755859375 0 0 0
0%
3Bhk 93.7699966430664 0 0 0
0%
3Bhk 101.11000061035156 0 0 0
0%
3Bhk 101.2300033569336 0 0 0
0%
3Bhk 104.44000244140625 0 0 0
0%
4Bhk 136.66000366210938 0 0 0
0%
4Bhk 144.5 0 0 0
0%

Wing D

Type Carpet (sq.ft) Total Booked Available Status
1RK 43.48 1 0 1
0%
2 BHK 65.15 11 11 0
100%
2 BHK 66.01 33 28 5
85%
2 BHK 66.33 44 16 28
36%
2 BHK 67.7 44 35 9
80%
2 BHK 67.88 37 20 17
54%

Wing E

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 63.73 37 28 9
76%
2 BHK 63.97 37 28 9
76%
2 BHK 65.78 1 0 1
0%
3 BHK 88.06 1 0 1
0%
3 BHK 93.77 33 32 1
97%
3 BHK 101.11 32 31 1
97%
3 BHK 101.23 11 8 3
73%
3 BHK 104.44 11 10 1
91%
4 BHK 136.66 33 29 4
88%
4 BHK 144.5 11 8 3
73%

Construction Progress

WING D

Basement (if any)100%

Wing D

Excavation100%

WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%

WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises52%

WING D

Plinth100%
Podiums (if any) 100%

Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING D

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.78%

WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing41%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure98%

WING E

Basement (if any)100%

Wing E

Excavation100%

WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate35%

WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises57%

WING E

Plinth100%
Podiums (if any) 100%

Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING E

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%

Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.81%

WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing66%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 35%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 65%
Energy management
Fire Protection And Fire Safety Requirements 35%
Landscaping & Tree Planting 50%
Open Parking 10%
Sewerage (Chamber, Lines, Septic Tank , STP) 95%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 95%
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.