📞 +91 98200 30685 ✉️
RERA: A51800043517

DOSTI WEST COUNTY - DOSTI TULIP

by DOSTI ENTERPRISES Others
Certificate Signed P51700032666
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700032666
Registration No.
REA51700100634
Registration Date
2022-01-17
Developer
DOSTI ENTERPRISES Others
Architect
Architect Jay R Vora
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2026-10-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
672
Units Sold
514 (76%)
Buildings
3
Project Area
11210.00 sq.m
Total FSI
71701.00
Approved FSI
50174.80
MahaRERA QR
DOSTI WEST COUNTY - DOSTI TULIP
MahaRERA — P51700032666
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors34
Sanctioned34
🏠Habitable30
🔢Total Units196
🏡Residential181
🏢Non-Residential15
🅿️Closed Parking249
📅Completion2026-10-31
🏗️Proposed Floors34
Sanctioned34
🏠Habitable30
🔢Total Units245
🏡Residential230
🏢Non-Residential15
🅿️Closed Parking297
📅Completion2026-10-31
🏗️Proposed Floors33
Sanctioned33
🏠Habitable28
🔢Total Units231
🏡Residential231
🅿️Closed Parking48
📅Completion2026-10-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 45.7599983215332 0 0 0
0%
2Bhk 49.369998931884766 0 0 0
0%
2Bhk 49.59000015258789 0 0 0
0%
2Bhk 56.43000030517578 0 0 0
0%
2Bhk 56.7400016784668 0 0 0
0%
2Bhk 57.79999923706055 0 0 0
0%
2Bhk 57.91999816894531 0 0 0
0%
2Bhk 65.23999786376953 0 0 0
0%
3Bhk 81.12999725341797 0 0 0
0%
Shop 13.289999961853027 0 0 0
0%
Shop 13.319999694824219 0 0 0
0%
Shop 13.619999885559082 0 0 0
0%
Shop 14.960000038146973 0 0 0
0%
Shop 15.0 0 0 0
0%
Shop 16.530000686645508 0 0 0
0%
Shop 27.219999313354492 0 0 0
0%
Shop 27.229999542236328 0 0 0
0%
Shop 27.860000610351562 0 0 0
0%
Shop 27.8799991607666 0 0 0
0%
Shop 28.770000457763672 0 0 0
0%
Shop 28.809999465942383 0 0 0
0%
Shop 30.200000762939453 0 0 0
0%
Shop 30.540000915527344 0 0 0
0%
Shop 30.579999923706055 0 0 0
0%
Shop 31.600000381469727 0 0 0
0%
Shop 31.6200008392334 0 0 0
0%

Building 1 Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 45.76 3 0 3
0%
2 BHK 56.74 58 58 0
100%
2 BHK 57.8 60 59 1
98%
2 BHK 65.24 2 1 1
50%
3 BHK 81.13 58 55 3
95%
Shop 13.32 2 2 0
100%
Shop 15.0 2 2 0
100%
Shop 16.53 2 2 0
100%
Shop 27.22 2 0 2
0%
Shop 27.86 2 1 1
50%
Shop 28.77 1 1 0
100%
Shop 30.2 1 1 0
100%
Shop 30.54 1 1 0
100%
Shop 31.62 2 2 0
100%

Building 2 Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 49.37 52 52 0
100%
2 BHK 56.43 60 59 1
98%
2 BHK 56.74 58 57 1
98%
2 BHK 65.24 3 2 1
67%
3 BHK 81.13 57 53 4
93%
Shop 13.29 2 0 2
0%
Shop 13.62 1 1 0
100%
Shop 14.96 2 1 1
50%
Shop 16.53 2 1 1
50%
Shop 27.23 2 2 0
100%
Shop 27.88 2 2 0
100%
Shop 28.81 1 0 1
0%
Shop 30.58 1 1 0
100%
Shop 31.6 2 1 1
50%

Building 3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 49.59 52 19 33
37%
2 BHK 56.43 60 26 34
43%
2 BHK 56.74 29 12 17
41%
2 BHK 57.92 30 13 17
43%
2 BHK 65.24 1 0 1
0%
3 BHK 81.13 59 22 37
37%

Construction Progress

Building 1 wing A

Basement (if any)100%

Building 1 Wing A

Excavation100%

Building 1 wing A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%

Building 1 Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Building 1 wing A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.24%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%

Building 1 Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises78%

Building 1 wing A

Plinth100%
Podiums (if any) 100%

Building 1 Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Building 1 wing A

Sanitary Fittings within the flats / premises77%
Slabs of Super Structure100%

Building 1 Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

Building 1 wing A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 1 Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building 2 wing B

Basement (if any)100%

Building 2 Wing B

Excavation100%

Building 2 wing B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.91%

Building 2 Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Building 2 wing B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.17%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%

Building 2 Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises78%

Building 2 wing B

Plinth100%
Podiums (if any) 100%

Building 2 Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Building 2 wing B

Sanitary Fittings within the flats / premises77%
Slabs of Super Structure100%

Building 2 Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

Building 2 wing B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Building 2 Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises9%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises13%
Slabs of Super Structure48%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks66%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure48%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.