Project Information

RERA Certificate No.
P51700046624
Registration No.
REA51700116497
Registration Date
2022-08-25
Developer
LAKHANI BUILDERS PVT LTD Company
Architect
Anil Jagwani
Project Bank
HDFC BANK
Proposed Possession
2027-07-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
85
Units Sold
18 (21%)
Buildings
1
Project Area
2029.88 sq.m
Total FSI
8825.10
Approved FSI
8825.10
MahaRERA QR
EMPIRE HERITAGE
MahaRERA — P51700046624
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🏠Habitable15
🔢Total Units85
🏡Residential85
🅿️Closed Parking73
📅Completion2027-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 61.61000061035156 0 0 0
0%
2Bhk 63.45000076293945 0 0 0
0%
2Bhk 64.25 0 0 0
0%
3Bhk 79.18000030517578 0 0 0
0%
3Bhk 109.4000015258789 0 0 0
0%

Building 1

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 61.61 14 2 12
14%
2 BHK 63.45 15 0 15
0%
2 BHK 64.25 14 7 7
50%
3 BHK 79.18 14 3 11
21%
3 BHK 109.4 1 0 1
0%

Construction Progress

BUILDING 1

Basement (if any)100%

Building 1

Excavation100%

BUILDING 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%

Building 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

BUILDING 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%

Building 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

BUILDING 1

Plinth100%
Podiums (if any) 0%

Building 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

BUILDING 1

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure81%

Building 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

BUILDING 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

Building 1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.