RERA: A51800043517

Fortune Avirahi Wing A

by Fortune Constructions
Certificate SignedP51800004496

Project Information

RERA Certificate No.
P51800004496
Registration No.
REA51800014149
Registration Date
2024-08-20
Developer
Fortune Constructions
Architect
Mr Tarun Motta Teearch
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
2025-12-31
Total Units
41
Units Sold
28 (68%)
Buildings
2
Project Area
2200.00 sq.m
Total FSI
8815.28
Approved FSI
8815.28
MahaRERA QR
Fortune Avirahi Wing A
MahaRERA — P51800004496
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements1
🚗Open Parking28
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors11
Sanctioned11

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk75.80999755859375000
0%
3Bhk90.7699966430664000
0%
3Bhk95.41000366210938000
0%
3Bhk110.73999786376953000
0%
4Bhk134.99000549316406000
0%
5Bhk &Amp;Amp;Amp; More154.58999633789062000
0%
Office Space68.83999633789062000
0%
Office Space76.55000305175781000
0%
Office Space127.6500015258789000
0%
Office Space140.27999877929688000
0%
Office Space141.1199951171875000
0%
Office Space144.4600067138672000
0%
Office Space217.3000030517578000
0%
Office Space467.95001220703125000
0%
Shop146.32000732421875000
0%
Shop148.63999938964844000
0%
Shop153.1999969482422000
0%
Shop192.8699951171875000
0%

Fortune Avirahi Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK110.7414122
86%
4 BHK134.991183
73%
Office space76.55110
100%
Office space127.65110
100%
Office space140.28110
100%
Office space144.46110
100%
Office space467.95110
100%
Shop146.32110
100%
Shop148.64110
100%
Shop153.2110
100%

Construction Progress

Fortune Avirahi Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing88%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Fortune Avirahi Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station85%
Energy management
Fire Protection And Fire Safety Requirements90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)70%
Solid Waste Management And Disposal70%
Storm Water Drains100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water15%
Water Conservation, Rain water Harvesting100%
Water Supply50%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.