📞 +91 98200 30685 ✉️
RERA: A51800043517

FORTUNE AVIRAHI WING A

by FORTUNE CONSTRUCTIONS Partnership
Certificate Signed P51800004496
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800004496
Registration No.
REA51800014149
Registration Date
2024-08-20
Developer
FORTUNE CONSTRUCTIONS Partnership
Architect
Mr Tarun Motta Teearch
Proposed Possession
2022-12-30
Revised Possession
2022-12-30
Extended Possession
2025-12-31
Units Sold
0
Buildings
2
Project Area
2200.00 sq.m
Total FSI
8815.28
Approved FSI
8815.28
MahaRERA QR
FORTUNE AVIRAHI WING A
MahaRERA — P51800004496
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
⬇️Basements1
🚗Open Parking28
🅿️Closed Parking1
📅Completion2021-12-31
🏗️Proposed Floors11
Sanctioned11

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 75.80999755859375 0 0 0
0%
3Bhk 90.7699966430664 0 0 0
0%
3Bhk 95.41000366210938 0 0 0
0%
3Bhk 110.73999786376953 0 0 0
0%
4Bhk 134.99000549316406 0 0 0
0%
5Bhk &Amp;Amp;Amp; More 154.58999633789062 0 0 0
0%
Office Space 68.83999633789062 0 0 0
0%
Office Space 76.55000305175781 0 0 0
0%
Office Space 127.6500015258789 0 0 0
0%
Office Space 140.27999877929688 0 0 0
0%
Office Space 141.1199951171875 0 0 0
0%
Office Space 144.4600067138672 0 0 0
0%
Office Space 217.3000030517578 0 0 0
0%
Office Space 467.95001220703125 0 0 0
0%
Shop 146.32000732421875 0 0 0
0%
Shop 148.63999938964844 0 0 0
0%
Shop 153.1999969482422 0 0 0
0%
Shop 192.8699951171875 0 0 0
0%

Fortune Avirahi Wing A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 110.74 14 12 2
86%
4 BHK 134.99 11 8 3
73%
Office space 76.55 1 1 0
100%
Office space 127.65 1 1 0
100%
Office space 140.28 1 1 0
100%
Office space 144.46 1 1 0
100%
Office space 467.95 1 1 0
100%
Shop 146.32 1 1 0
100%
Shop 148.64 1 1 0
100%
Shop 153.2 1 1 0
100%

Construction Progress

Fortune Avirahi Wing A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing88%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises95%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Fortune Avirahi Wing B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 85%
Energy management
Fire Protection And Fire Safety Requirements 90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 70%
Solid Waste Management And Disposal 70%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 15%
Water Conservation, Rain water Harvesting 100%
Water Supply 50%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.