📞 +91 98200 30685 ✉️
RERA: A51800043517

Godrej Exquisite

by Godrej Macbricks Private Limited Company
Certificate Signed P51700024496
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700024496
Registration No.
REA51700069658
Registration Date
2021-09-09
Developer
Godrej Macbricks Private Limited Company
Project Bank
AXIS BANK
Proposed Possession
2025-03-30
Revised Possession
1900-01-01
Extended Possession
2026-09-30
Units Sold
0
Buildings
3
Project Area
14626.00 sq.m
Total FSI
52000.00
Approved FSI
38083.00
MahaRERA QR
Godrej Exquisite
MahaRERA — P51700024496
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors44
Sanctioned44
🏠Habitable39
🅿️Closed Parking248
📅Completion2024-09-30
🏗️Proposed Floors44
Sanctioned44
🏠Habitable39
🅿️Closed Parking239
📅Completion2024-09-30
🏗️Proposed Floors44
Sanctioned44
🏠Habitable39
🅿️Closed Parking218
📅Completion2024-09-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bed Luxe 43.02000045776367 0 0 0
0%
1 Bed Luxe 44.15999984741211 0 0 0
0%
1 Bed Luxe 44.33000183105469 0 0 0
0%
1 Bed Luxe 44.7599983215332 0 0 0
0%
2 Bed Luxe 58.970001220703125 0 0 0
0%
2 Bed Premium 57.849998474121094 0 0 0
0%
2 Premium 44.09000015258789 0 0 0
0%
2 Premium 45.4900016784668 0 0 0
0%
3 Bed Luxe 60.61000061035156 0 0 0
0%
3 Bed Luxe 78.91999816894531 0 0 0
0%
3 Premium 60.400001525878906 0 0 0
0%
3 Premium 61.31999969482422 0 0 0
0%
3 Premium 65.37999725341797 0 0 0
0%
Office Space 27.5 0 0 0
0%
Office Space 27.6200008392334 0 0 0
0%
Office Space 43.790000915527344 0 0 0
0%
Office Space 45.150001525878906 0 0 0
0%
Office Space 47.79999923706055 0 0 0
0%
Office Space 153.82000732421875 0 0 0
0%
Office Space 175.63999938964844 0 0 0
0%
Office Space 214.60000610351562 0 0 0
0%
Shop 57.869998931884766 0 0 0
0%
Shop 61.900001525878906 0 0 0
0%
Shop 73.2300033569336 0 0 0
0%
Shop 75.30999755859375 0 0 0
0%
Shop 90.16999816894531 0 0 0
0%
Shop 94.51000213623047 0 0 0
0%
Shop 98.38999938964844 0 0 0
0%
Shop 114.83000183105469 0 0 0
0%
Shop 137.19000244140625 0 0 0
0%
Shop 169.33999633789062 0 0 0
0%

Tower 1

Type Carpet (sq.ft) Total Booked Available Status
2 Bed Luxe 58.97 39 30 9
77%
2 Bed Premium 57.85 74 62 12
84%
3 Bed Luxe 60.61 66 40 26
61%
3 Bed Luxe 78.92 12 0 12
0%
3 Premium 60.4 24 19 5
79%
3 Premium 65.38 5 0 5
0%
Office space 27.5 1 1 0
100%
Office space 27.62 1 1 0
100%
Office space 43.79 1 1 0
100%
Office space 45.15 1 1 0
100%
Office space 47.8 1 1 0
100%
Office space 153.82 1 1 0
100%
Office space 175.64 1 0 1
0%
Office space 214.6 1 0 1
0%
Shop 57.87 1 1 0
100%
Shop 61.9 1 1 0
100%
Shop 73.23 1 1 0
100%
Shop 75.31 1 1 0
100%
Shop 90.17 1 1 0
100%
Shop 94.51 1 0 1
0%
Shop 98.39 1 1 0
100%
Shop 114.83 1 0 1
0%
Shop 137.19 1 1 0
100%
Shop 169.34 1 1 0
100%

Tower 2

Type Carpet (sq.ft) Total Booked Available Status
2 Bed Luxe 58.97 39 34 5
87%
2 Bed Premium 57.85 74 64 10
86%
3 Bed Luxe 60.61 66 40 26
61%
3 Bed Luxe 78.92 12 2 10
17%
3 Premium 61.32 24 23 1
96%
3 Premium 65.38 5 3 2
60%

Tower 3 - Evoke

Type Carpet (sq.ft) Total Booked Available Status
1 Bed Luxe 43.02 31 25 6
81%
1 Bed Luxe 44.16 13 12 1
92%
1 Bed Luxe 44.33 2 2 0
100%
1 Bed Luxe 44.76 1 1 0
100%
2 Bed Luxe 58.97 39 37 2
95%
2 Bed Premium 57.85 28 22 6
79%
2 Premium 44.09 13 11 2
85%
2 Premium 45.49 4 4 0
100%
3 Bed Luxe 60.61 66 51 15
77%
3 Bed Luxe 78.92 12 8 4
67%
3 Premium 61.32 10 10 0
100%
3 Premium 65.38 1 0 1
0%

Construction Progress

Tower 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure92%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure55%

Tower 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises42%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure87%

Tower 3 - Evoke

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises7%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure61%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure34%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.