Project Information

RERA Certificate No.
P51700077787
Registration No.
REA51700160356
Registration Date
2024-10-30
Developer
SQUAREFEET ENTERPRISES Partnership
Architect
Ten Folds Architects And Consultants
Project Bank
AXIS BANK
Proposed Possession
2030-12-31
Units Sold
0
Project Area
1404.25 sq.m
Total FSI
42888.59
Approved FSI
42888.59
MahaRERA QR
GREEN SQUARE- PHASE II TOWER 1 AND 3
MahaRERA — P51700077787
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors23
Sanctioned23
🅿️Closed Parking90
📅Completion2030-12-31
🏗️Proposed Floors37
Sanctioned37
🅿️Closed Parking420
📅Completion2030-12-31

Apartment Configurations

Tower 1

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 29.86 19 0 19
0%
1 BHK 29.97 44 0 44
0%
1 BHK 35.54 66 0 66
0%
1 BHK 36.71 88 0 88
0%
Shop 17.52 1 0 1
0%
Shop 20.35 2 0 2
0%
Shop 22.32 1 0 1
0%
Shop 22.88 1 0 1
0%
Shop 26.94 2 0 2
0%
Shop 29.22 1 0 1
0%
Shop 42.63 1 0 1
0%
Shop 42.97 1 0 1
0%

Tower 3

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 49.1 142 0 142
0%
2 BHK 49.24 136 0 136
0%
2 BHK 49.3 142 0 142
0%

Construction Progress

TOWER 1

Basement (if any)0%

Tower 1

Excavation0%

TOWER 1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower 1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

TOWER 1

Plinth0%
Podiums (if any) 0%

Tower 1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER 1

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Tower 1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER 1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower 1

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

TOWER 3

Basement (if any)0%

Tower 3

Excavation0%

TOWER 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

TOWER 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

TOWER 3

Plinth0%
Podiums (if any) 0%

Tower 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

TOWER 3

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Tower 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

TOWER 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Tower 3

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.