Project Information

RERA Certificate No.
P51700001515
Registration No.
REA51700005580
Registration Date
2017-07-28
Developer
HAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED Company
Architect
Mr Vinay Patil
Project Bank
THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession
2019-04-30
Revised Possession
2019-04-30
Extended Possession
2020-10-29
Units Sold
0
Buildings
3
Project Area
3978.00 sq.m
Total FSI
6385.17
Approved FSI
6385.17
MahaRERA QR
DAHLIA BLDG A D AND E
MahaRERA — P51700001515
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
Sanctioned17
🚗Open Parking79
🅿️Closed Parking14
📅Completion1900-01-01
🏗️Proposed Floors19
Sanctioned19
🅿️Closed Parking1
📅Completion1900-01-01
🏗️Proposed Floors4
Sanctioned4
🅿️Closed Parking1
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 844.47998046875 0 0 0
0%
1Rk 20.579999923706055 0 0 0
0%
1Rk 1451.4000244140625 0 0 0
0%
2Bhk 1543.719970703125 0 0 0
0%
3Bhk 2078.919921875 0 0 0
0%
Shops 319.7200012207031 0 0 0
0%

Dahlia A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 844.48 28 18 10
64%
1RK 1451.4 60 48 12
80%

Dahlia D

Type Carpet (sq.ft) Total Booked Available Status
1rk 20.58 1 0 1
0%
2 BHK 1543.72 32 13 19
41%
3 BHK 2078.92 33 15 18
45%

Dahlia E

Type Carpet (sq.ft) Total Booked Available Status
SHOPS 319.72 4 4 0
100%

Construction Progress

DAHLIA A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.52%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure45%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
Stilt Floor 90%

DAHLIA D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
Stilt Floor 100%

DAHLIA E

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 40%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 30%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.