H
✓ MahaRERA P99000076711RERA: no litigation reported20
Units
2027
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Reported stage: New · Confirm current availability on WhatsApp.
Possession Timeline
Proposed
Apr 2027
Status
New
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK647 ft²On request
3 BHK957 ft²On request
5 BHK Amp Amp1,524 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisorRERA Trust Record
MahaRERA No.
P99000076711
Registered
2024-06-21
Litigation
No reported in source
Escrow Bank
FEDERAL BANK
Architect
Ajay Wade & Associates
Total FSI
3293
Buildings · 1 Wing(s)
Building No-3 Wing C15 floors · 20 units
Location
📍 Waliv
19.4189755,72.8626417
19.4189755,72.8626417
▸ Explore map & Street View — for verified buyers
Construction Progress
0% avgBasement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
Amenities
Electrical meter room, sub-station, receiving stationEnergy managemcntFire protection and fire safety requirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsTreatment And Disposal Of Sewage And Sullage WaterWater SupplyWater conservation /Rain water harvesting
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventoryProperty Rates in Waliv
Residential · Sale
₹10,000–45,000/sqft
Commercial · Sale
₹6,500–15,000/sqft
2 BHK · Rent
₹20,000–45,000/mo
Full rates
More by Sky Developers
MahaRERA projects nearby in Waliv
MERKEZ324 unitsAPEKSHA COMPLEX208 unitsAQSA BUILDING 2191 unitsLAXMI HEIGHTS166 unitsDHANANJAY AND HAYAAT INDUSTRIAL ESTATE162 unitssignature heights123 unitsGovind Enclave119 unitsASHIYANA118 unitsShashwat Aangan Building / Wing B115 unitsHayaat Galaxy II85 unitsCHAITANYA SIGNATURE73 unitsSIGNATURECLASSIC68 units
Frequently Asked Questions
When is possession of Hayaat Tower C Wing?
As per MahaRERA, proposed possession is Apr 2027.
Is Hayaat Tower C Wing RERA-registered?
Yes — MahaRERA registration P99000076711, registered 2024-06-21. The current MahaRERA source record reports no litigations.
Who is the developer?
Sky Developers — 28 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




