📞 +91 98200 30685 ✉️
RERA: A51800043517

INSIGNIA

by ULTRA SPACE DEVELOPERS PRIVATE LIMITED Company
Certificate Signed P51800002313
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800002313
Registration No.
REA51800008541
Registration Date
2017-07-31
Developer
ULTRA SPACE DEVELOPERS PRIVATE LIMITED Company
Architect
Gvs Architects & Associates
Project Bank
STATE BANK OF INDIA
Proposed Possession
2020-04-30
Revised Possession
2020-04-30
Extended Possession
2022-06-30
Units Sold
0
Buildings
6
Project Area
9203.00 sq.m
Total FSI
28915.98
Approved FSI
27608.02
MahaRERA QR
INSIGNIA
MahaRERA — P51800002313
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🚗Open Parking27
🅿️Closed Parking89
📅Completion2018-12-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🚗Open Parking22
🅿️Closed Parking99
📅Completion2018-12-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🅿️Closed Parking91
📅Completion2018-12-31
🏗️Proposed Floors20
Sanctioned20
⬇️Basements4
🚗Open Parking18
🅿️Closed Parking33
📅Completion2018-12-31
🏗️Proposed Floors21
Sanctioned21
⬇️Basements4
🚗Open Parking10
🅿️Closed Parking70
📅Completion2018-12-31
🏗️Proposed Floors21
Sanctioned21
⬇️Basements4
🚗Open Parking16
🅿️Closed Parking144
📅Completion2018-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2.5 Bhk Type 1 88.0999984741211 0 0 0
0%
2.5 Bhk Type 1 91.93000030517578 0 0 0
0%
2.5 Bhk Type 1 93.44999694824219 0 0 0
0%
2.5 Bhk Type 2 87.63999938964844 0 0 0
0%
2.5 Bhk Type 2 90.05000305175781 0 0 0
0%
2.5 Bhk Type 2 92.31999969482422 0 0 0
0%
2.5 Bhk Type 3 90.2699966430664 0 0 0
0%
2.5 Bhk Type 4 90.05000305175781 0 0 0
0%
3 Bhk Type 1 101.87999725341797 0 0 0
0%
3 Bhk Type 1 103.08999633789062 0 0 0
0%
3 Bhk Type 1 128.67999267578125 0 0 0
0%
3 Bhk Type 2 103.81999969482422 0 0 0
0%
3 Bhk Type 2 103.87999725341797 0 0 0
0%
3 Bhk Type 2 137.0500030517578 0 0 0
0%
3 Bhk Type 3 131.74000549316406 0 0 0
0%
3.5 Bhk Type 1 118.94999694824219 0 0 0
0%
3.5 Bhk Type 1 121.19999694824219 0 0 0
0%
3.5 Bhk Type 1 123.43000030517578 0 0 0
0%
3.5 Bhk Type 2 116.04000091552734 0 0 0
0%
3.5 Bhk Type 2 120.31999969482422 0 0 0
0%
3.5 Bhk Type 2 121.73999786376953 0 0 0
0%
3.5 Bhk Type 3 118.69000244140625 0 0 0
0%
3.5 Bhk Type 4 120.29000091552734 0 0 0
0%
4 Bhk Type 1 132.08999633789062 0 0 0
0%
4 Bhk Type 1 135.00999450683594 0 0 0
0%
4 Bhk Type 1 150.44000244140625 0 0 0
0%
4 Bhk Type 2 132.11000061035156 0 0 0
0%
4 Bhk Type 2 133.8000030517578 0 0 0
0%
4 Bhk Type 2 151.77999877929688 0 0 0
0%
4 Bhk Type 3 132.61000061035156 0 0 0
0%
4 Bhk Type 3 151.85000610351562 0 0 0
0%
4 Bhk Type 4 149.6199951171875 0 0 0
0%
4.5 Bhk Type 1 159.52999877929688 0 0 0
0%
4.5 Bhk Type 2 162.7899932861328 0 0 0
0%
4.5 Bhk Type 3 162.58999633789062 0 0 0
0%
4.5 Bhk Type 4 163.94000244140625 0 0 0
0%
5 Bhk 208.2100067138672 0 0 0
0%
5 Bhk Type 1 166.0800018310547 0 0 0
0%
5 Bhk Type 2 162.49000549316406 0 0 0
0%
5 Bhk Type 3 167.22999572753906 0 0 0
0%
5 Bhk Type 4 165.0 0 0 0
0%
6 Bhk Type 1 239.88999938964844 0 0 0
0%
Shop 1 445.95001220703125 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2.5 BHK TYPE 1 88.1 2 2 0
100%
2.5 BHK TYPE 2 87.64 2 2 0
100%
2.5 BHK TYPE 3 90.27 2 2 0
100%
2.5 BHK TYPE 4 90.05 2 2 0
100%
3.5 BHK TYPE 1 118.95 10 10 0
100%
3.5 BHK TYPE 2 116.04 10 10 0
100%
3.5 BHK TYPE 3 118.69 10 10 0
100%
3.5 BHK TYPE 4 120.29 10 10 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
2.5 BHK TYPE 1 91.93 2 2 0
100%
2.5 BHK TYPE 2 90.05 2 2 0
100%
3 BHK TYPE 1 101.88 2 2 0
100%
3 BHK TYPE 2 103.88 2 2 0
100%
3.5 BHK TYPE 1 121.2 10 10 0
100%
3.5 BHK TYPE 2 120.32 6 6 0
100%
4 BHK TYPE 1 132.09 14 14 0
100%
4 BHK TYPE 2 132.11 6 6 0
100%
4 BHK TYPE 3 132.61 4 4 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
2.5 BHK TYPE 1 93.45 2 2 0
100%
2.5 BHK TYPE 2 92.32 2 2 0
100%
3 BHK TYPE 1 103.09 2 2 0
100%
3 BHK TYPE 2 103.82 2 2 0
100%
3.5 BHK TYPE 1 123.43 10 10 0
100%
3.5 BHK TYPE 2 121.74 10 10 0
100%
4 BHK TYPE 1 135.01 10 10 0
100%
4 BHK TYPE 2 133.8 10 10 0
100%

Wing D

Type Carpet (sq.ft) Total Booked Available Status
5 BHK 208.21 4 4 0
100%
6 BHK TYPE 1 239.89 8 8 0
100%

Wing E

Type Carpet (sq.ft) Total Booked Available Status
3 BHK TYPE 1 128.68 2 2 0
100%
3 BHK TYPE 2 137.05 20 20 0
100%
3 BHK TYPE 3 131.74 4 4 0
100%

Wing F

Type Carpet (sq.ft) Total Booked Available Status
4 BHK TYPE 1 150.44 2 2 0
100%
4 BHK TYPE 2 151.78 2 2 0
100%
4 BHK TYPE 3 151.85 2 2 0
100%
4 BHK TYPE 4 149.62 2 2 0
100%
4.5 BHK TYPE 1 159.53 1 1 0
100%
4.5 BHK TYPE 2 162.79 1 1 0
100%
4.5 BHK TYPE 3 162.59 10 10 0
100%
4.5 BHK TYPE 4 163.94 10 10 0
100%
5 BHK TYPE 1 166.08 1 1 0
100%
5 BHK TYPE 2 162.49 1 1 0
100%
5 BHK TYPE 3 167.23 10 10 0
100%
5 BHK TYPE 4 165.0 10 10 0
100%
SHOP 1 445.95 1 0 1
0%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING A

Plinth100%
Podiums (if any) 100%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%

WING A

Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING B

Plinth100%
Podiums (if any) 100%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%

WING B

Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING C

Plinth100%
Podiums (if any) 100%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%

WING C

Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING D

Basement (if any)100%

Wing D

Excavation100%

WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING D

Plinth100%
Podiums (if any) 100%

Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%

WING D

Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%

Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING E

Basement (if any)100%

Wing E

Excavation100%

WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING E

Plinth100%
Podiums (if any) 100%

Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING E

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING F

Basement (if any)100%

Wing F

Excavation100%

WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%

Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate98%

WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING F

Plinth100%
Podiums (if any) 100%

Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING F

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing98%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 95%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 95%
Energy management
Fire Protection And Fire Safety Requirements 90%
Landscaping & Tree Planting 90%
Open Parking 98%
Sewerage (Chamber, Lines, Septic Tank , STP) 98%
Solid Waste Management And Disposal 98%
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 98%
Water Conservation, Rain water Harvesting 90%
Water Supply 95%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.