Ithink Tower - A

Mumbai · by Lodha Developers

Updated Oct 2026

Ithink Tower - AProject photos will appear here when available.
13
Units
2022
Possession
1
Buildings
Certificate Signed
Status

A first look at Ithink Tower - A

Ithink Tower - A is a residential project by Lodha Developers in Mumbai, Mumbai 400607. It is registered with MahaRERA under P51700033958 (registered 2022-03-14). The project has 13 units across 1 building of up to 14 floors. MahaRERA proposed possession: May 2022.

Lifecycle requires verification.

Ask an advisor to verify the current project and inventory status.

Unit Configurations (per MahaRERA)

ConfigurationCarpetIndicative Price
Office Space8,315–33,354 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor

About Ithink Tower - A

Location

Ithink Tower - A is located in Mumbai, Mumbai 400607, in the Thane district.

MahaRERA record

The MahaRERA registration number is P51700033958, issued on 14 March 2022. The registered promoter is Lodha Developers Limited. The filing lists 1 wing: iThink Tower-A over 14 floors. Per the registration, the architect on record is Vilas Desai & Associate and the project escrow account is with HDFC Bank.

Construction and possession

The latest MahaRERA progress report shows foundation at 100%, structure at 100%, finishing at 100%, services at 100%. Proposed possession is May 2022.

Developer track record

Lodha Developers has 143 projects tracked on Mumbai Property Exchange, 102 of them delivered (ready or sold out). Other projects by the same developer include Lodha Divino Tower 6, Casa Premier, Lodha Aureus.

Mumbai market

prices, rents & rates

Property rates in Mumbai

Residential · Sale
₹15,000–45,000/sqft
Commercial · Sale
₹15,000–45,000/sqft
2 BHK · Rent
₹45,000–100,000/mo

Upcoming projects & infrastructure in Dombivali

take an informed decision

233 MahaRERA projects are due to hand over in Dombivali between 2026 and 2030; the nearest upcoming infrastructure to Ithink Tower - A is the Virar-Alibaug Multimodal Corridor, 0.1 km away (approved).

233
MahaRERA projects handing over in the next 5 years
in Dombivali
₹15,100/sqft
ready reckoner rate (government)
2025-26 · stamp duty is charged on the higher of this and the deal value
New projects in Dombivali by possession year
25
2026
69
2027
64
2028
52
2029
23
2030
Metro & infrastructure near Ithink Tower - A
  • 🛣️Virar-Alibaug Multimodal CorridorApproved0.1 km
  • 🚇Airoli-Katai Naka Tunnel RoadUnder construction · due 20270.4 km
  • 🛣️Mumbai-Delhi Expressway (Vadodara link)Under construction · due 20281.7 km
Questions about Dombivali prices?

Ask on WhatsApp — we answer right in the chat with live asking prices, listings and registered sales for Dombivali, then an advisor calls about your budget and configuration.

Prices and timelines are indicative and subject to change. See the disclaimer at the foot of this page.

RERA record & possession

Possession (proposed)
May 2022
Project status
New
MahaRERA No.
P51700033958
Data last updated
Oct 2026
Registered
2022-03-14
Escrow Bank
HDFC BANK
Architect
Vilas Desai & Associate
Total FSI
27,564

Buildings · 1 wing

iThink Tower-A · 14 fl · — u

Location

Map data © OpenStreetMap contributors · location indicativeOpen larger map ›

Construction progress

per MahaRERA
Foundation100%
Structure100%
Finishing100%
Services100%
See all 11 stages ▾
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terr…100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipm…100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within…100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and …100%
Stilt Floor100%

Amenities

14
Aggregate area of recreational Open SpaceElectrical meter room, sub-station, r…Energy managemcntFire protection and fire safety requi…Internal Roads & FootpathsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank…
+6 more ▾
Solid Waste Management And DisposalStorm Water DrainsStreet LightingTreatment And Disposal Of Sewage And …Water SupplyWater conservation /Rain water harvesting

Next steps — clarity before you step out

Buying a home is not a quick decision. In association with developers, Mumbai Property Exchange sets up the video briefings (Google Meet, Teams or WhatsApp video), the site visits and the paperwork questions — so your homework is done before you commit an afternoon.

Resale Flats for Sale in Mumbai

4

Flats for Rent in Mumbai

3

Commercial Projects in Mumbai

More by Lodha Developers

MahaRERA projects nearby in Mumbai

Frequently Asked Questions

Where is Ithink Tower - A located?

Ithink Tower - A is in Mumbai, Mumbai 400607.

When is possession of Ithink Tower - A?

As per MahaRERA, proposed possession is May 2022.

Is Ithink Tower - A RERA-registered?

Yes — MahaRERA registration P51700033958, registered 2022-03-14.

How many units does Ithink Tower - A have?

MahaRERA records 13 units across 1 building, up to 14 floors.

Who is the developer of Ithink Tower - A?

Lodha Developers — 143 projects tracked on Mumbai Property Exchange.

How many new projects are coming up in Dombivali?

233 MahaRERA-registered projects in Dombivali are due for possession between 2026 and 2030, as per MahaRERA registrations. Timelines can change.

What metro and infrastructure is near Ithink Tower - A?

Virar-Alibaug Multimodal Corridor — approved, 0.1 km away; Airoli-Katai Naka Tunnel Road — under construction · due 2027, 0.4 km away; Mumbai-Delhi Expressway (Vadodara link) — under construction · due 2028, 1.7 km away. Timelines are as announced and can change.

How do I book or get more details?

Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.

Disclaimer. Information on this page is compiled from MahaRERA registrations, public infrastructure announcements, developer materials and Mumbai Property Exchange listings. Prices, availability, possession dates and infrastructure timelines are indicative, subject to change, and updated periodically (last updated 2026-10-02). This is not an offer or an advertisement by the developer; please verify all details with the developer and on MahaRERA before deciding. Mumbai Property Exchange, MahaRERA agent A51800043517.
Are you the developer and see something wrong? Report a correction on WhatsApp — we verify and update.