📞 +91 98200 30685✉️
RERA: A51800043517

Jp North Celeste

by J. P. Infra (Mumbai) Private Limited Company
Certificate SignedP51700008667

Project Information

RERA Certificate No.
P51700008667
Registration No.
REA51700012695
Registration Date
2017-08-19
Developer
J. P. Infra (Mumbai) Private Limited Company
Architect
Rajesh Khandeparkar Of M/S Urbdes
Project Bank
HDFC BANK
Proposed Possession
2019-06-30
Revised Possession
2019-06-30
Extended Possession
2020-12-29
Units Sold
0
Buildings
1
Project Area
1510.23 sq.m
Total FSI
14937.24
Approved FSI
14937.24
MahaRERA QR
Jp North Celeste
MahaRERA — P51700008667
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors16
Sanctioned16
🅿️Closed Parking133
📅Completion2019-06-30

Apartment Configurations

Jp North Celeste

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.0990
100%
1 BHK34.15651
83%
1 BHK34.2211110
100%
1 BHK34.2915150
100%
1 BHK34.3770
100%
1 BHK34.41550
100%
1 BHK34.57770
100%
1 BHK34.68660
100%
1 BHK34.86660
100%
2 BHK46.71990
100%
2 BHK46.8110100
100%
2 BHK46.91990
100%
2 BHK47.3914140
100%
2 BHK48.85660
100%
2 BHK49.05431
75%
2 BHK49.47871
88%
2 BHK49.5710100
100%
2 BHK50.29541
80%
2 BHK50.32651
83%
Shop8.42110
100%
Shop10.14110
100%
Shop10.52110
100%
Shop11.38330
100%
Shop13.63110
100%
Shop14.41220
100%
Shop15.03110
100%
Shop15.29110
100%
Shop15.66110
100%
Shop16.06330
100%
Shop17.65220
100%
Shop19.43110
100%
Shop23.84110
100%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk33.0000
0%
1Bhk34.150001525878906000
0%
1Bhk34.220001220703125000
0%
1Bhk34.290000915527344000
0%
1Bhk34.29999923706055000
0%
1Bhk34.40999984741211000
0%
1Bhk34.56999969482422000
0%
1Bhk34.68000030517578000
0%
1Bhk34.86000061035156000
0%
2Bhk46.709999084472656000
0%
2Bhk46.810001373291016000
0%
2Bhk46.90999984741211000
0%
2Bhk47.38999938964844000
0%
2Bhk48.849998474121094000
0%
2Bhk49.04999923706055000
0%
2Bhk49.470001220703125000
0%
2Bhk49.56999969482422000
0%
2Bhk50.290000915527344000
0%
2Bhk50.31999969482422000
0%
Shop8.420000076293945000
0%
Shop10.140000343322754000
0%
Shop10.520000457763672000
0%
Shop11.380000114440918000
0%
Shop13.630000114440918000
0%
Shop14.40999984741211000
0%
Shop15.029999732971191000
0%
Shop15.289999961853027000
0%
Shop15.65999984741211000
0%
Shop16.059999465942383000
0%
Shop17.649999618530273000
0%
Shop19.43000030517578000
0%
Shop23.84000015258789000
0%

Construction Progress

JP North Celeste

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Jp North Celeste

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space100%
Community Buildings100%
Covered Parking Podium Building80%
Electrical Meter Room, Sub-Station, Receiving Station100%
Energy management100%
Fire Protection And Fire Safety Requirements100%
Landscaping & Tree Planting100%
Open Parking100%
Sewerage (Chamber, Lines, Septic Tank , STP)100%
Solid Waste Management And Disposal100%
Storm Water Drains100%
Street Lighting100%
Treatment And Disposal Of Sewage And Sullage Water100%
Water Conservation, Rain water Harvesting100%
Water Supply100%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.