Proposed Possession
2025-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
154
Units Sold
153 (99%)
Buildings
2
Project Area
571.37 sq.m
Total FSI
7179.72
Approved FSI
4003.23
MahaRERA QR
Veridian at Emerald Isle 13A and 13B
MahaRERA — P51800029893
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
🏠Habitable20
🔢Total Units78
🏡Residential78
🅿️Closed Parking24
📅Completion2025-03-31
🏗️Proposed Floors23
Sanctioned23
🏠Habitable20
🔢Total Units76
🏡Residential76
🅿️Closed Parking48
📅Completion2025-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk M Stilt 48.970001220703125 0 0 0
0%
1 Bhk Optima 35.45000076293945 0 0 0
0%
2 Bhk Elita 46.75 0 0 0
0%
2 Bhk Magna 55.279998779296875 0 0 0
0%
2 Bhk Magna Stilt 55.279998779296875 0 0 0
0%
Studio 29.309999465942383 0 0 0
0%

Veridian At Emerald Isle 13A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK OPTIMA 35.45 76 76 0
100%
STUDIO 29.31 2 2 0
100%

Veridian At Emerald Isle 13B

Type Carpet (sq.ft) Total Booked Available Status
1 BHK M STILT 48.97 1 0 1
0%
2 BHK ELITA 46.75 38 38 0
100%
2 BHK MAGNA 55.28 36 36 0
100%
2 BHK MAGNA STILT 55.28 1 1 0
100%

Construction Progress

Veridian at Emerald Isle 13A

Basement (if any)100%

Veridian At Emerald Isle 13A

Excavation100%

Veridian at Emerald Isle 13A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Veridian At Emerald Isle 13A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Veridian at Emerald Isle 13A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

Veridian At Emerald Isle 13A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises3%
Overall Percentage of Completion of the work done For the entire Building /Wing44%

Veridian at Emerald Isle 13A

Plinth100%
Podiums (if any) 100%

Veridian At Emerald Isle 13A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Veridian at Emerald Isle 13A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure37%

Veridian At Emerald Isle 13A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Veridian at Emerald Isle 13A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Veridian At Emerald Isle 13A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure37%

Veridian at Emerald Isle 13B

Basement (if any)100%

Veridian At Emerald Isle 13B

Excavation100%

Veridian at Emerald Isle 13B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Veridian At Emerald Isle 13B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Veridian at Emerald Isle 13B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%

Veridian At Emerald Isle 13B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises5%

Veridian at Emerald Isle 13B

Plinth100%
Podiums (if any) 100%

Veridian At Emerald Isle 13B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Veridian at Emerald Isle 13B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure39%

Veridian At Emerald Isle 13B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

Veridian at Emerald Isle 13B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Veridian At Emerald Isle 13B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure39%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings 50%
Electrical Meter Room, Sub-Station, Receiving Station 15%
Energy management
Fire Protection And Fire Safety Requirements 25%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 66%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 66%
Water Conservation, Rain water Harvesting 50%
Water Supply 30%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.