Lodha Amara -Tower 42 And 43

by Lodha Developers Limited Company
Certificate SignedP51700020164
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51700020164
Registration No.
REA51700054285
Registration Date
2025-10-01
Developer
Lodha Developers Limited Company
Architect
Vini
Project Bank
KOTAK MAHINDRA BANK LIMITED
Proposed Possession
2025-03-30
Revised Possession
1900-01-01
Extended Possession
2027-12-31
Total Units
462
Units Sold
305 (66%)
Buildings
2
Project Area
2695.00 sq.m
Total FSI
16893.00
Approved FSI
813.00
MahaRERA QR
Lodha Amara -Tower 42 And 43
MahaRERA — P51700020164
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors39
āœ…Sanctioned39
šŸ Habitable39
šŸ”¢Total Units231
šŸ”Residential231
šŸ“…Completion2024-03-31
šŸ—ļøProposed Floors39
āœ…Sanctioned39
šŸ Habitable39
šŸ”¢Total Units231
šŸ”Residential231
šŸ“…Completion2024-03-31

Apartment Configurations

Tower 42

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK39.67735914
81%
1 BHK39.86776611
86%
2 BHK56.58220
100%
2 BHK62.34707
0%
2 BHK ULTIMA55.6572693
96%

Tower 43

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.74110
100%
1 BHK39.6772072
0%
1 BHK39.86791267
15%
2 BHK55.6569663
9%
2 BHK56.49871
88%
2 BHK56.58110
100%
3 BHK76.55101
0%

Construction Progress

Tower 42

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises50%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

Tower 43

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing20%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises5%
Slabs of Super Structure50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
āœ…Closed Parkings100%
āœ…Community Buildings60%
āœ…Electrical Meter Room, Sub-Station, Receiving Station80%
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements60%
āœ…Landscaping & Tree Planting
āœ…Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)100%
āœ…Solid Waste Management And Disposal100%
āœ…Storm Water Drains50%
āœ…Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water75%
āœ…Water Conservation, Rain water Harvesting40%
āœ…Water Supply65%
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now