M
✓ MahaRERA P99000007649RERA: no litigation reported55
Units
2020
Possession
1
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: On-Going Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2020
Revised
Dec 2021
Status
On-Going Project
⚠ Possession revised later than originally proposed — per MahaRERA.
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop116–156 ft²On request
2 BHK581 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000007649
Registered
—
Litigation
No reported in source
Escrow Bank
Kotak mahindra Bank
Architect
—
Total FSI
3223
04
Buildings · 1 Wing(s)
Mahavir Darshan— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Global City
19.469757289261008,72.799995514677450
19.469757289261008,72.799995514677450
▸ Explore map & Street View — for verified buyers
09
Construction Progress
90% avgExcavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate95%
X number of Podiums0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingSewerage (Chamber, Lines, Septic Tank , STP)Solid Waste Management And DisposalStorm Water DrainsTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Mahavir Realtors
15
MahaRERA projects nearby in Global City
?
Frequently Asked Questions
When is possession of Mahavir Darshan?
As per MahaRERA, proposed possession is Dec 2020, revised to Dec 2021.
Is Mahavir Darshan RERA-registered?
Yes — MahaRERA registration P99000007649. The current MahaRERA source record reports no litigations.
Who is the developer?
Mahavir Realtors — 21 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.