Proposed Possession
2018-12-31
Revised Possession
2018-12-31
Extended Possession
2019-08-30
Units Sold
0
Buildings
8
Project Area
11173.90 sq.m
Total FSI
30224.93
Approved FSI
29451.62
MahaRERA QR
MAN OPUS
MahaRERA — P51700008395
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
⬇️Basements1
🅿️Closed Parking91
📅Completion1900-01-01
🏗️Proposed Floors26
Sanctioned26
⬇️Basements1
🅿️Closed Parking61
📅Completion1900-01-01
🏗️Proposed Floors26
Sanctioned26
⬇️Basements1
🅿️Closed Parking61
📅Completion1900-01-01
🏗️Proposed Floors22
Sanctioned22
⬇️Basements1
🅿️Closed Parking15
📅Completion1900-01-01
🏗️Proposed Floors25
Sanctioned25
⬇️Basements1
🅿️Closed Parking19
📅Completion1900-01-01
🏗️Proposed Floors25
Sanctioned25
⬇️Basements1
🅿️Closed Parking12
📅Completion1900-01-01
🏗️Proposed Floors25
Sanctioned25
🅿️Closed Parking10
📅Completion1900-01-01
🏗️Proposed Floors6
Sanctioned6
🅿️Closed Parking5
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk 33.209999084472656 0 0 0
0%
1 Bhk 33.59000015258789 0 0 0
0%
1 Bhk 35.40999984741211 0 0 0
0%
1 Rk 14.859999656677246 0 0 0
0%
1.5 Bhk 40.31999969482422 0 0 0
0%
1.5 Bhk 40.61000061035156 0 0 0
0%
1.5 Bhk 40.70000076293945 0 0 0
0%
1.5 Bhk 40.880001068115234 0 0 0
0%
1.5 Bhk 40.900001525878906 0 0 0
0%
2 Bhk 50.529998779296875 0 0 0
0%
2 Bhk 51.06999969482422 0 0 0
0%
Shop 1 32.90999984741211 0 0 0
0%
Shop 2 18.90999984741211 0 0 0
0%
Shop 3 27.59000015258789 0 0 0
0%
Shop 4 17.270000457763672 0 0 0
0%
Shop 5 14.850000381469727 0 0 0
0%
Shop 6 14.850000381469727 0 0 0
0%
Shop 7 17.049999237060547 0 0 0
0%
Shop 8 27.59000015258789 0 0 0
0%
Shop 9 38.86000061035156 0 0 0
0%
Shop 9 39.189998626708984 0 0 0
0%

A - Bldg 8,9

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.59 41 32 9
78%
1.5 BHK 40.7 125 80 45
64%

C1 - Bldg 2, 3

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.21 44 39 5
89%
1.5 BHK 40.32 44 35 9
80%
2 BHK 50.53 88 70 18
80%
SHOP 1 32.91 1 0 1
0%
SHOP 2 18.91 1 0 1
0%
SHOP 3 27.59 1 0 1
0%
SHOP 4 17.27 1 1 0
100%
SHOP 5 14.85 1 1 0
100%
SHOP 6 14.85 1 1 0
100%
SHOP 7 17.05 1 1 0
100%
SHOP 8 27.59 1 0 1
0%
SHOP 9 39.19 1 0 1
0%

C2 - Bldg 4,5

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.21 44 35 9
80%
1.5 BHK 40.32 44 31 13
70%
2 BHK 50.53 88 72 16
82%
SHOP 1 32.91 1 0 1
0%
SHOP 2 18.91 1 0 1
0%
SHOP 3 27.59 1 0 1
0%
SHOP 4 17.27 1 0 1
0%
SHOP 5 14.85 1 0 1
0%
SHOP 6 14.85 1 0 1
0%
SHOP 7 17.05 1 0 1
0%
SHOP 8 27.59 1 0 1
0%
SHOP 9 38.86 1 0 1
0%

D1 - Bldg 7 - Phase 2

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 40.88 32 13 19
41%
2 BHK 51.07 18 6 12
33%

D2- Bldg 6 - Phase 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.41 21 13 8
62%
1.5 BHK 40.9 42 19 23
45%

E - Bldg 1 - Phase 2

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.41 18 4 14
22%
1.5 BHK 40.61 21 10 11
48%

Rental-Bldg R1

Type Carpet (sq.ft) Total Booked Available Status
1 RK 14.86 549 0 549
0%

Rental-Bldg R2

Type Carpet (sq.ft) Total Booked Available Status
1 RK 14.86 15 0 15
0%

Construction Progress

A - BLDG 8,9

Basement (if any)100%

A - Bldg 8,9

Excavation100%

A - BLDG 8,9

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A - Bldg 8,9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A - BLDG 8,9

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

A - Bldg 8,9

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing50%

A - BLDG 8,9

Plinth100%
Podiums (if any) 100%

A - Bldg 8,9

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A - BLDG 8,9

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

A - Bldg 8,9

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A - BLDG 8,9

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

A - Bldg 8,9

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

C1 - BLDG 2, 3

Basement (if any)100%

C1 - Bldg 2, 3

Excavation100%

C1 - BLDG 2, 3

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

C1 - Bldg 2, 3

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate45%

C1 - BLDG 2, 3

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

C1 - Bldg 2, 3

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

C1 - BLDG 2, 3

Plinth100%
Podiums (if any) 100%

C1 - Bldg 2, 3

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises60%

C1 - BLDG 2, 3

Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%

C1 - Bldg 2, 3

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

C1 - BLDG 2, 3

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

C1 - Bldg 2, 3

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

C2 - BLDG 4,5

Basement (if any)100%

C2 - Bldg 4,5

Excavation100%

C2 - BLDG 4,5

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

C2 - Bldg 4,5

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate50%

C2 - BLDG 4,5

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%

C2 - Bldg 4,5

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%

C2 - BLDG 4,5

Plinth100%
Podiums (if any) 100%

C2 - Bldg 4,5

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises65%

C2 - BLDG 4,5

Sanitary Fittings within the flats / premises65%
Slabs of Super Structure100%

C2 - Bldg 4,5

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%

C2 - BLDG 4,5

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

C2 - Bldg 4,5

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing75%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

D1 - BLDG 7 - PHASE 2

Basement (if any)100%

D1 - Bldg 7 - Phase 2

Excavation100%

D1 - BLDG 7 - PHASE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D1 - Bldg 7 - Phase 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D1 - BLDG 7 - PHASE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D1 - Bldg 7 - Phase 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

D1 - BLDG 7 - PHASE 2

Plinth100%
Podiums (if any) 100%

D1 - Bldg 7 - Phase 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D1 - BLDG 7 - PHASE 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure32%

D1 - Bldg 7 - Phase 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D1 - BLDG 7 - PHASE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D1 - Bldg 7 - Phase 2

Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure32%

D2- BLDG 6 - PHASE 2

Basement (if any)100%

D2- Bldg 6 - Phase 2

Excavation100%

D2- BLDG 6 - PHASE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D2- Bldg 6 - Phase 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D2- BLDG 6 - PHASE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

D2- Bldg 6 - Phase 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing44%

D2- BLDG 6 - PHASE 2

Plinth100%
Podiums (if any) 100%

D2- Bldg 6 - Phase 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D2- BLDG 6 - PHASE 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure55%

D2- Bldg 6 - Phase 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D2- BLDG 6 - PHASE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

D2- Bldg 6 - Phase 2

Stilt Floor85%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure55%

E - BLDG 1 - PHASE 2

Basement (if any)100%

E - Bldg 1 - Phase 2

Excavation100%

E - BLDG 1 - PHASE 2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

E - Bldg 1 - Phase 2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

E - BLDG 1 - PHASE 2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

E - Bldg 1 - Phase 2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

E - BLDG 1 - PHASE 2

Plinth100%
Podiums (if any) 100%

E - Bldg 1 - Phase 2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

E - BLDG 1 - PHASE 2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure18%

E - Bldg 1 - Phase 2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

E - BLDG 1 - PHASE 2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

E - Bldg 1 - Phase 2

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure18%

RENTAL-BLDG R1

Basement (if any)100%

Rental-Bldg R1

Excavation100%

RENTAL-BLDG R1

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%

Rental-Bldg R1

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RENTAL-BLDG R1

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%

Rental-Bldg R1

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises25%

RENTAL-BLDG R1

Plinth100%
Podiums (if any) 0%

Rental-Bldg R1

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises10%

RENTAL-BLDG R1

Sanitary Fittings within the flats / premises10%
Slabs of Super Structure100%

Rental-Bldg R1

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

RENTAL-BLDG R1

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Rental-Bldg R1

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing30%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RENTAL-BLDG R2

Basement (if any)60%

Rental-Bldg R2

Excavation100%

RENTAL-BLDG R2

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Rental-Bldg R2

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

RENTAL-BLDG R2

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Rental-Bldg R2

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%

RENTAL-BLDG R2

Plinth60%
Podiums (if any) 0%

Rental-Bldg R2

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

RENTAL-BLDG R2

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Rental-Bldg R2

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

RENTAL-BLDG R2

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Rental-Bldg R2

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth60%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 5%
Energy management
Fire Protection And Fire Safety Requirements 10%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 15%
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.