📞 +91 98200 30685 ✉️
RERA: A51800043517

MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19, 23A, 26, 27

by MAYFAIR HOUSING Partnership
Certificate Signed P99000034708
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P99000034708
Registration No.
REA99000105811
Registration Date
2025-06-16
Developer
MAYFAIR HOUSING Partnership
Architect
Jai
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-03-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
901
Units Sold
246 (27%)
Buildings
6
Project Area
13862.00 sq.m
Total FSI
52131.00
Approved FSI
52131.00
MahaRERA QR
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19, 23A, 26, 27
MahaRERA — P99000034708
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units177
🏡Residential165
🏢Non-Residential12
📅Completion2027-03-31
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units177
🏡Residential165
🏢Non-Residential12
📅Completion2027-03-31
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units177
🏡Residential165
🏢Non-Residential12
📅Completion2027-03-31
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units108
🏡Residential105
🏢Non-Residential3
📅Completion2027-03-31
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units173
🏡Residential165
🏢Non-Residential8
📅Completion2027-03-31
🏗️Proposed Floors24
Sanctioned24
🏠Habitable22
🔢Total Units89
🏡Residential84
🏢Non-Residential5
📅Completion2027-03-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 35.900001525878906 0 0 0
0%
1Bhk 36.13999938964844 0 0 0
0%
2Bhk 47.150001525878906 0 0 0
0%
2Bhk 48.54999923706055 0 0 0
0%
Shop 11.600000381469727 0 0 0
0%
Shop 14.0 0 0 0
0%
Shop 14.300000190734863 0 0 0
0%
Shop 15.90999984741211 0 0 0
0%
Shop 16.219999313354492 0 0 0
0%
Shop 16.440000534057617 0 0 0
0%
Shop 18.850000381469727 0 0 0
0%
Shop 20.31999969482422 0 0 0
0%
Shop 20.6200008392334 0 0 0
0%
Shop 20.829999923706055 0 0 0
0%
Shop 20.84000015258789 0 0 0
0%
Shop 21.700000762939453 0 0 0
0%
Shop 22.0 0 0 0
0%
Shop 22.899999618530273 0 0 0
0%
Shop 25.0 0 0 0
0%
Shop 25.299999237060547 0 0 0
0%
Shop 29.239999771118164 0 0 0
0%
Shop 29.899999618530273 0 0 0
0%
Shop 31.600000381469727 0 0 0
0%

Building No 17

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.9 39 0 39
0%
1 BHK 36.14 84 0 84
0%
2 BHK 48.55 42 0 42
0%
Shop 15.91 2 0 2
0%
Shop 16.22 1 0 1
0%
Shop 16.44 1 0 1
0%
Shop 20.32 4 0 4
0%
Shop 20.62 1 0 1
0%
Shop 20.83 2 0 2
0%
Shop 20.84 1 0 1
0%

Building No 18

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.9 39 0 39
0%
1 BHK 36.14 84 0 84
0%
2 BHK 48.55 42 0 42
0%
Shop 15.91 2 0 2
0%
Shop 16.22 1 0 1
0%
Shop 16.44 1 0 1
0%
Shop 20.32 4 0 4
0%
Shop 20.62 1 0 1
0%
Shop 20.83 2 0 2
0%
Shop 20.84 1 0 1
0%

Building No 19

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.9 39 0 39
0%
1 BHK 36.14 84 0 84
0%
2 BHK 48.55 42 0 42
0%
Shop 15.91 2 0 2
0%
Shop 16.22 1 0 1
0%
Shop 16.44 1 0 1
0%
Shop 20.32 4 0 4
0%
Shop 20.62 1 0 1
0%
Shop 20.83 2 0 2
0%
Shop 20.84 1 0 1
0%

Building No 23A

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.14 84 0 84
0%
2 BHK 47.15 21 0 21
0%
Shop 11.6 1 0 1
0%
Shop 14.3 1 0 1
0%
Shop 25.0 1 0 1
0%

Building No 26

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 35.9 39 32 7
82%
1 BHK 36.14 84 62 22
74%
2 BHK 48.55 42 42 0
100%
Shop 18.85 2 0 2
0%
Shop 21.7 2 0 2
0%
Shop 22.9 2 0 2
0%
Shop 29.24 2 0 2
0%

Building No 27

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 36.14 84 82 2
98%
Shop 14.0 1 0 1
0%
Shop 22.0 1 0 1
0%
Shop 25.3 1 0 1
0%
Shop 29.9 1 0 1
0%
Shop 31.6 1 0 1
0%

Construction Progress

Building No 17

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 18

Basement (if any)15%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth15%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth15%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 19

Basement (if any)55%
Excavation25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth55%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth53%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 23A

Basement (if any)95%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing16%
Plinth95%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth60%
X number of Podiums0%
X number of Slabs of Super Structure0%

Building No 26

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Sanitary Fittings within the flats / premises60%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing50%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Building No 27

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Non Tower Area Podium 70%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 90%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply 10%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.