RERA: A51800043517

TRITON

by Jade Constructions Private Limited Company
Certificate Signed P51800031222
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800031222
Registration No.
REA51800094906
Registration Date
2021-10-11
Developer
Jade Constructions Private Limited Company
Architect
Ark Reza Kabul Architect Pvt Ltd
Project Bank
HDFC BANK
Proposed Possession
2025-07-01
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
3358.30 sq.m
Total FSI
11466.79
Approved FSI
11463.57
MahaRERA QR
TRITON
MahaRERA — P51800031222
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
🅿️Closed Parking24
📅Completion2025-01-07
🏗️Proposed Floors18
Sanctioned18
🅿️Closed Parking1
📅Completion2025-01-07
🏗️Proposed Floors19
Sanctioned19
🅿️Closed Parking1
📅Completion2025-01-07

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3Bhk 117.75 0 0 0
0%
3Bhk 118.86000061035156 0 0 0
0%
3Bhk 123.93000030517578 0 0 0
0%
3Bhk 125.63999938964844 0 0 0
0%
3Bhk 133.32000732421875 0 0 0
0%
3Bhk 140.64999389648438 0 0 0
0%
3Bhk 142.3699951171875 0 0 0
0%
3Bhk 156.10000610351562 0 0 0
0%
3Bhk 351.7900085449219 0 0 0
0%
4Bhk 170.38999938964844 0 0 0
0%
4Bhk 207.69000244140625 0 0 0
0%
4Bhk 239.38999938964844 0 0 0
0%
4Bhk 250.64999389648438 0 0 0
0%
5Bhk &Amp;Amp; More 269.1000061035156 0 0 0
0%
Ext Area Member Flat 9.75 0 0 0
0%
Extention Area 9.75 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 117.75 2 1 1
50%
3 BHK 118.86 1 1 0
100%
3 BHK 123.93 1 1 0
100%
3 BHK 133.32 2 0 2
0%
4 BHK 170.39 1 1 0
100%
4 BHK 207.69 1 1 0
100%
4 BHK 239.39 1 0 1
0%
4 BHK 250.65 1 0 1
0%
Extention Area 9.75 1 1 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 125.64 2 1 1
50%
3 BHK 142.37 2 1 1
50%
5 BHK & more 269.1 4 1 3
25%
Ext Area Member Flat 9.75 2 2 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 140.65 6 1 5
17%
3 BHK 156.1 5 2 3
40%
3 BHK 351.79 1 0 1
0%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING A

Plinth100%
Podiums (if any) 100%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING A

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING B

Plinth100%
Podiums (if any) 100%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING B

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING C

Plinth100%
Podiums (if any) 100%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING C

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing95%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 60%
Energy management
Fire Protection And Fire Safety Requirements 70%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 75%
Solid Waste Management And Disposal 75%
Storm Water Drains 65%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 50%
Water Conservation, Rain water Harvesting 50%
Water Supply 50%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.