📞 +91 98200 30685 ✉️
RERA: A51800043517

Forestville - Phase 1

by Oberoi Realty Limited Company
Certificate Signed P51700050312
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700050312
Registration No.
REA51700133196
Registration Date
2023-11-10
Developer
Oberoi Realty Limited Company
Architect
Siddhesh
Project Bank
AXIS BANK
Proposed Possession
2029-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
1257
Units Sold
264 (21%)
Buildings
3
Project Area
6023.82 sq.m
Total FSI
143250.53
Approved FSI
143250.53
MahaRERA QR
Forestville - Phase 1
MahaRERA — P51700050312
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors66
Sanctioned66
🏠Habitable60
🔢Total Units415
🏡Residential415
🅿️Closed Parking1
📅Completion2029-12-31
🏗️Proposed Floors66
Sanctioned66
🏠Habitable60
🔢Total Units415
🏡Residential415
🅿️Closed Parking1
📅Completion2029-12-31
🏗️Proposed Floors66
Sanctioned66
🏠Habitable60
🔢Total Units427
🏡Residential427
🅿️Closed Parking425
📅Completion2029-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3Bhk Deluxe 97.69000244140625 0 0 0
0%
3Bhk Elite A 104.9800033569336 0 0 0
0%
3Bhk Elite B 97.66000366210938 0 0 0
0%
3Bhk Majestic 97.16000366210938 0 0 0
0%
4.5Bhk Palatial 154.4600067138672 0 0 0
0%
Duplex 174.35000610351562 0 0 0
0%
Duplex Plus 173.27999877929688 0 0 0
0%
Duplex Studio 26.06999969482422 0 0 0
0%
Garden Studio 26.06999969482422 0 0 0
0%
Garden Suite A 174.35000610351562 0 0 0
0%
Garden Suite B 173.27999877929688 0 0 0
0%
Majestic Studio 26.06999969482422 0 0 0
0%

Tower A

Type Carpet (sq.ft) Total Booked Available Status
3 BHK Deluxe 97.69 188 9 179
5%
3 BHK Majestic 97.16 102 2 100
2%
4.5 BHK Palatial 154.46 11 0 11
0%
Duplex 174.35 4 0 4
0%
Duplex Plus 173.28 2 0 2
0%
Duplex Studio 26.07 4 0 4
0%
Garden Suite A 174.35 2 0 2
0%
Majestic Studio 26.07 102 2 100
2%

Tower B

Type Carpet (sq.ft) Total Booked Available Status
3 BHK Deluxe 97.69 182 39 143
21%
3 BHK Majestic 97.16 102 17 85
17%
4.5 BHK Palatial 154.46 11 1 10
9%
Duplex 174.35 4 0 4
0%
Duplex Plus 173.28 2 0 2
0%
Duplex Studio 26.07 4 0 4
0%
Garden Studio 26.07 4 0 4
0%
Garden Suite A 174.35 2 0 2
0%
Garden Suite B 173.28 2 0 2
0%
Majestic Studio 26.07 102 17 85
17%

Tower C

Type Carpet (sq.ft) Total Booked Available Status
3 BHK Deluxe 97.69 182 92 90
51%
3 BHK Elite A 104.98 2 0 2
0%
3 BHK Elite B 97.66 1 0 1
0%
3 BHK Majestic 97.16 107 9 98
8%
4.5 BHK Palatial 154.46 11 0 11
0%
Duplex 174.35 4 0 4
0%
Duplex Plus 173.28 2 0 2
0%
Duplex Studio 26.07 4 0 4
0%
Garden Suite A 174.35 4 0 4
0%
Majestic Studio 26.07 110 9 101
8%

Construction Progress

Tower A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.14%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 17%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing6%
X number of Basement(s) and Plinth100%
X number of Podiums9%
X number of Slabs of Super Structure13%

Tower B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.29%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 17%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure58%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing7%
X number of Basement(s) and Plinth100%
X number of Podiums9%
X number of Slabs of Super Structure15%

Tower C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.29%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises8%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises1%
Overall Percentage of Completion of the work done For the entire Building /Wing35%
Plinth100%
Podiums (if any) 17%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure58%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.11%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing9%
X number of Basement(s) and Plinth100%
X number of Podiums9%
X number of Slabs of Super Structure20%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.