O
✓ MahaRERA P51900047623RERA: no litigation reportedOne - 38
Bilawal Exports
📍 Tardeo Ac Market, Mumbai City · 400034
38
Units
2026
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jun 2026
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK890–920 ft²On request
3 BHK1,048 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51900047623
Registered
2022-11-15
Litigation
No reported in source
Escrow Bank
KOTAK MAHINDRA BANK LIMITED
Architect
Rohini Parsekar
Total FSI
3707
04
Buildings · 1 Wing(s)
One-3825 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Tardeo Ac Market
18.9727595,72.8140203
18.9727595,72.8140203
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
BILAWAL EXPORTS PVT LTDNA
09
Construction Progress
0% avgBasement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 0%
10
Amenities
ENTRANCE FOYERElectrical Meter Room, Sub-Station, Receiving StationFITNESS CENTRE OR GYMFire Protection And Fire Safety RequirementsInternal Roads & FootpathsMULTIPURPOSE HALLPLUNGE POOLSECURITY CABINSERVICE AREASOCIETY OFFICESewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsTERRACE LANSCAPINGTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater SupplyWater conservation /Rain water harvesting
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory?
Frequently Asked Questions
When is possession of One - 38?
As per MahaRERA, proposed possession is Jun 2026.
Is One - 38 RERA-registered?
Yes — MahaRERA registration P51900047623, registered 2022-11-15. The current MahaRERA source record reports no litigations.
Who is the developer?
Bilawal Exports
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




