📞 +91 98200 30685 ✉️
RERA: A51800043517

Paradigm Anantaara

by Shubhyuvi Infrastructure LLP
Certificate Signed P51800034854
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800034854
Registration No.
REA51800106962
Registration Date
2023-10-30
Developer
Shubhyuvi Infrastructure LLP
Project Bank
HDFC BANK
Proposed Possession
2030-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
5110.28 sq.m
Total FSI
41217.00
Approved FSI
17015.00
MahaRERA QR
Paradigm Anantaara
MahaRERA — P51800034854
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking155
📅Completion2027-12-31
🅿️Closed Parking14
📅Completion2028-12-31
🅿️Closed Parking20
📅Completion2030-12-31

Apartment Configurations

Segment I Of Sale Building From Ground To 30Th Fl

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 63.17 38 0 38
0%
2 BHK 68.93 38 0 38
0%
3 BHK 96.99 17 0 17
0%
3 BHK 97.36 17 0 17
0%
3 BHK 108.05 19 0 19
0%
3 BHK 108.51 19 0 19
0%
Shop 25.33 2 0 2
0%
Shop 45.26 1 0 1
0%
Shop 82.34 1 0 1
0%
Shop 91.58 1 0 1
0%
Shop 164.83 1 0 1
0%
Shop 226.66 1 0 1
0%

Segment Ii Of Sale Building 31St To 40Th Floors

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 64.38 4 0 4
0%
2 BHK 69.21 4 0 4
0%
3 BHK 96.99 1 0 1
0%
3 BHK 97.36 1 0 1
0%
3 BHK 108.05 2 0 2
0%
3 BHK 108.51 2 0 2
0%
Proposed 2BHK 64.38 12 0 12
0%
Proposed 2BHK 69.21 12 0 12
0%
Proposed 2BHK 116.97 1 0 1
0%
Proposed 2BHK 127.0 1 0 1
0%
Proposed 2BHK 130.62 1 0 1
0%
Proposed 2BHK 142.51 1 0 1
0%
Proposed 3BHK 96.99 6 0 6
0%
Proposed 3BHK 97.36 6 0 6
0%
Proposed 3BHK 108.05 6 0 6
0%
Proposed 3BHK 108.51 6 0 6
0%
Proposed 3BHK 195.0 1 0 1
0%
Proposed 3BHK 220.55 1 0 1
0%

Segment Iii Of Sale Building 41St Floor And Above

Type Carpet (sq.ft) Total Booked Available Status
Proposed 2BHK 42.55 1 0 1
0%

Construction Progress

Segment I Of Sale Building From Ground To 30Th Fl

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Segment Ii Of Sale Building 31St To 40Th Floors

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Segment Iii Of Sale Building 41St Floor And Above

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.