📞 +91 98200 30685✉️
RERA: A51800043517

Paradigm Anantaara

by Shubhyuvi Infrastructure Llp
Certificate SignedP51800034854

Project Information

RERA Certificate No.
P51800034854
Registration No.
REA51800106962
Registration Date
2023-10-30
Developer
Shubhyuvi Infrastructure Llp
Project Bank
HDFC BANK
Proposed Possession
2030-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
5110.28 sq.m
Total FSI
41217.00
Approved FSI
17015.00
MahaRERA QR
Paradigm Anantaara
MahaRERA — P51800034854
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking155
📅Completion2027-12-31
🅿️Closed Parking14
📅Completion2028-12-31
🅿️Closed Parking20
📅Completion2030-12-31

Apartment Configurations

Segment I Of Sale Building From Ground To 30Th Fl

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK63.1738038
0%
2 BHK68.9338038
0%
3 BHK96.9917017
0%
3 BHK97.3617017
0%
3 BHK108.0519019
0%
3 BHK108.5119019
0%
Shop25.33202
0%
Shop45.26101
0%
Shop82.34101
0%
Shop91.58101
0%
Shop164.83101
0%
Shop226.66101
0%

Segment Ii Of Sale Building 31St To 40Th Floors

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK64.38404
0%
2 BHK69.21404
0%
3 BHK96.99101
0%
3 BHK97.36101
0%
3 BHK108.05202
0%
3 BHK108.51202
0%
Proposed 2BHK64.3812012
0%
Proposed 2BHK69.2112012
0%
Proposed 2BHK116.97101
0%
Proposed 2BHK127.0101
0%
Proposed 2BHK130.62101
0%
Proposed 2BHK142.51101
0%
Proposed 3BHK96.99606
0%
Proposed 3BHK97.36606
0%
Proposed 3BHK108.05606
0%
Proposed 3BHK108.51606
0%
Proposed 3BHK195.0101
0%
Proposed 3BHK220.55101
0%

Segment Iii Of Sale Building 41St Floor And Above

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Proposed 2BHK42.55101
0%

Construction Progress

Segment I Of Sale Building From Ground To 30Th Fl

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Segment Ii Of Sale Building 31St To 40Th Floors

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Segment Iii Of Sale Building 41St Floor And Above

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.