šŸ“ž +91 98200 30685āœ‰ļø
RERA: A51800043517

Pearl Queen

by Pearl Queen Cooperative Housing Society Limited Society
Certificate SignedP51800077027
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51800077027
Registration No.
REA51800163229
Registration Date
2024-08-20
Developer
Pearl Queen Cooperative Housing Society Limited Society
Architect
Shri Navin Vatnani
Project Bank
HDFC BANK
Proposed Possession
2029-06-30
Units Sold
0
Project Area
2313.50 sq.m
Total FSI
6871.09
MahaRERA QR
Pearl Queen
MahaRERA — P51800077027
Scan to verify on MahaRERA portal

Wing-wise Details

šŸ—ļøProposed Floors18
āœ…Sanctioned18
šŸ…æļøClosed Parking54
šŸ“…Completion2029-06-30
šŸ—ļøProposed Floors18
āœ…Sanctioned18
šŸ…æļøClosed Parking53
šŸ“…Completion2029-06-30

Apartment Configurations

Pearl Queen Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
5 BHK & more258.02110
100%
Existing Member103.39303
0%
Existing Member123.28202
0%
Existing Member126.09707
0%
Existing Member134.3101
0%

Pearl Queen Wing B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3 BHK152.42101
0%
5 BHK & more317.96110
100%
Existing Member119.44202
0%
Existing Member121.32202
0%
Existing Member152.42101
0%
Existing Member159.08707
0%
Existing Member177.44101
0%
Existing Member188.71101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
3Bhk152.4199981689453000
0%
5Bhk &Amp; More258.0199890136719000
0%
5Bhk &Amp;Amp; More317.9599914550781000
0%
Existing Member103.38999938964844000
0%
Existing Member119.44000244140625000
0%
Existing Member121.31999969482422000
0%
Existing Member123.27999877929688000
0%
Existing Member126.08999633789062000
0%
Existing Member134.3000030517578000
0%
Existing Member152.4199981689453000
0%
Existing Member159.0800018310547000
0%
Existing Member177.44000244140625000
0%
Existing Member188.7100067138672000
0%

Construction Progress

PEARL QUEEN WING A

Basement (if any)90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth90%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

PEARL QUEEN WING B

Basement (if any)90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth90%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Pearl Queen Wing A

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing12%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth30%
X number of Podiums0%
X number of Slabs of Super Structure0%

Pearl Queen Wing B

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing18%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth80%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
āœ…Energy management
āœ…Fire Protection And Fire Safety Requirements
⬜Landscaping & Tree Planting
⬜Open Parking
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)
āœ…Solid Waste Management And Disposal
āœ…Storm Water Drains
⬜Street Lighting
āœ…Treatment And Disposal Of Sewage And Sullage Water
āœ…Water Conservation, Rain water Harvesting
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now