Piramal Aranya - Wing A

by Glider Buildcon Realtors Private Limited Company
Certificate Signed P51900003324
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900003324
Registration No.
REA51900008492
Registration Date
2021-09-09
Developer
Glider Buildcon Realtors Private Limited Company
Project Bank
HDFC BANK
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Total Units
229
Units Sold
148 (65%)
Buildings
1
Project Area
1405.73 sq.m
Total FSI
63612.18
Approved FSI
48020.97
MahaRERA QR
Piramal Aranya - Wing A
MahaRERA — P51900003324
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors67
Sanctioned67
🔢Total Units229
🏡Residential229
⬇️Basements3
🅿️Closed Parking481
📅Completion2024-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 98.0 0 0 0
0%
2Bhk 99.0 0 0 0
0%
3Bhk 128.0 0 0 0
0%
3Bhk 140.0 0 0 0
0%
4Bhk 181.0 0 0 0
0%
4Bhk 247.0 0 0 0
0%

Avyan

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 98.0 9 9 0
100%
2 BHK 99.0 31 28 3
90%
3 BHK 128.0 40 23 17
57%
3 BHK 140.0 70 42 28
60%
4 BHK 181.0 39 34 5
87%
4 BHK 247.0 40 27 13
68%

Construction Progress

AVYAN

Basement (if any)100%

Avyan

Excavation100%

AVYAN

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Avyan

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

AVYAN

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Avyan

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

AVYAN

Plinth100%
Podiums (if any) 100%

Avyan

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

AVYAN

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Avyan

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

AVYAN

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Avyan

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.