P
✓ MahaRERA P99000006206RERA: no litigation reported12
Units
2019
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: Ongoing · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jan 2019
Revised
Jan 2019
Status
Ongoing
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop158–346 ft²On request
Basement2,651 ft²On request
First Floor3,019 ft²On request
Second Floor3,019 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000006206
Registered
2017-08-14
Litigation
No reported in source
Escrow Bank
BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Architect
Shah Gattani Consultants
Total FSI
874
04
Buildings · 1 Wing(s)
Poonam Prime4 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Vasai
19.461451000000000,72.801990000000000
19.461451000000000,72.801990000000000
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
Suresh MehtaPartner
09
Construction Progress
100% avgBasement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Plinth100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Vasai
Residential · Sale
₹10,000–45,000/sqft
Commercial · Sale
₹6,500–15,000/sqft
2 BHK · Rent
₹20,000–45,000/mo
Full rates
14
More by Prime Developers
15
MahaRERA projects nearby in Vasai
MLDC YASHWANT ORCHID PHASE I923 unitsMAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19, 23A, 26, 27901 unitsPEARL GARDENS656 unitsNakshatra Veda II514 unitsSunteck Beach Residences 4470 unitsSHRIPAL SATTVA - BLDG. 1431 unitsAkhand Phase 2409 unitsVIMAL CLASSIC380 unitsARMAAN LOTUS375 unitsOLYMPUS TOWERS355 unitsNAKSHATRA NIRVAANA II343 unitsNakshatra Veda340 units
?
Frequently Asked Questions
When is possession of Poonam Prime?
As per MahaRERA, proposed possession is Jan 2019, revised to Jan 2019.
Is Poonam Prime RERA-registered?
Yes — MahaRERA registration P99000006206, registered 2017-08-14. The current MahaRERA source record reports no litigations.
Who is the developer?
Prime Developers — 6 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.