RERA: A51800043517

Elito Grand Central

by Fortune Infracreators Private Limited Company
Certificate Signed P51700002741
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700002741
Registration No.
REA51700007083
Registration Date
2021-09-09
Developer
Fortune Infracreators Private Limited Company
Architect
Design Consortium Architects (I) Private Limited
Project Bank
HDFC BANK
Proposed Possession
2026-12-30
Revised Possession
2026-12-30
Extended Possession
1900-01-01
Total Units
278
Units Sold
176 (63%)
Buildings
1
Project Area
1902.55 sq.m
Total FSI
10858.83
Approved FSI
9478.83
MahaRERA QR
Elito Grand Central
MahaRERA — P51700002741
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors34
Sanctioned34
🏠Habitable30
🔢Total Units278
🏡Residential260
🏢Non-Residential18
⬇️Basements1
🅿️Closed Parking210
📅Completion2025-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk A 30.760000228881836 0 0 0
0%
1 Bhk B 31.030000686645508 0 0 0
0%
1 Bhk C 30.799999237060547 0 0 0
0%
2 Bhk A 41.47999954223633 0 0 0
0%
2 Bhk B 43.15999984741211 0 0 0
0%
2 Bhk C 42.959999084472656 0 0 0
0%
2 Bhk D 44.029998779296875 0 0 0
0%
2 Bhk E 43.869998931884766 0 0 0
0%
2 Bhk F 41.38999938964844 0 0 0
0%
Shop 1 47.900001525878906 0 0 0
0%
Shop 10 37.70000076293945 0 0 0
0%
Shop 11 26.059999465942383 0 0 0
0%
Shop 12 19.420000076293945 0 0 0
0%
Shop 13 18.56999969482422 0 0 0
0%
Shop 14 22.860000610351562 0 0 0
0%
Shop 15 21.479999542236328 0 0 0
0%
Shop 16 22.06999969482422 0 0 0
0%
Shop 17 39.27000045776367 0 0 0
0%
Shop 18 23.010000228881836 0 0 0
0%
Shop 2 42.90999984741211 0 0 0
0%
Shop 3 17.559999465942383 0 0 0
0%
Shop 4 7.139999866485596 0 0 0
0%
Shop 5 11.770000457763672 0 0 0
0%
Shop 6 18.479999542236328 0 0 0
0%
Shop 7 24.959999084472656 0 0 0
0%
Shop 8 23.969999313354492 0 0 0
0%
Shop 9 24.68000030517578 0 0 0
0%

Elito Grand Central

Type Carpet (sq.ft) Total Booked Available Status
1 BHK A 30.76 30 30 0
100%
1 BHK B 31.03 30 29 1
97%
1 BHK C 30.8 30 29 1
97%
2 BHK A 41.48 30 29 1
97%
2 BHK B 43.16 25 25 0
100%
2 BHK C 42.96 30 30 0
100%
2 BHK D 44.03 30 29 1
97%
2 BHK E 43.87 30 27 3
90%
2 BHK F 41.39 30 26 4
87%
Shop 1 47.9 1 1 0
100%
Shop 10 37.7 1 1 0
100%
Shop 11 26.06 1 1 0
100%
Shop 12 19.42 1 1 0
100%
Shop 13 18.57 1 1 0
100%
Shop 14 22.86 1 1 0
100%
Shop 15 21.48 1 1 0
100%
Shop 16 22.07 1 1 0
100%
Shop 17 39.27 1 1 0
100%
Shop 18 23.01 1 1 0
100%
Shop 2 42.91 1 1 0
100%
Shop 3 17.56 1 1 0
100%
Shop 4 7.14 1 1 0
100%
Shop 5 11.77 1 1 0
100%
Shop 6 18.48 1 1 0
100%
Shop 7 24.96 1 1 0
100%
Shop 8 23.97 1 1 0
100%
Shop 9 24.68 1 1 0
100%

Construction Progress

Elito Grand Central

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate7%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises55%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.66%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing20%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.