01
Possession Timeline
Proposed
Dec 2019
Revised
Dec 2019
Status
On-Going Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop113–165 ft²On request
1 RK226–240 ft²On request
1 BHK311–337 ft²On request
2 BHK440–485 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000003885
Registered
—
Litigation
No reported in source
Escrow Bank
DCB BANK LTD
Architect
Vijay Gurav And Associates
Total FSI
8163
04
Buildings · 4 Wing(s)
A Wing— floors · — units
B Wing— floors · — units
E Wing— floors · — units
F Wing— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Vasai East
19.373481999999999,72.886993000000004
19.373481999999999,72.886993000000004
▸ Explore map & Street View — for verified buyers
09
Construction Progress
84% avgExcavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Stilt Floor100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
Overall Percentage of Completion of the work done For the entire Building /Wing84%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate60%
X number of Podiums0%
10
Amenities
Community BuildingsSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsStreet LightingWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Reliable Realtouch
15
MahaRERA projects nearby in Vasai East
?
Frequently Asked Questions
When is possession of Rg - A,b,e,f?
As per MahaRERA, proposed possession is Dec 2019, revised to Dec 2019.
Is Rg - A,b,e,f RERA-registered?
Yes — MahaRERA registration P99000003885. The current MahaRERA source record reports no litigations.
Who is the developer?
Reliable Realtouch — 20 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.