✓ MahaRERA P99000015106RERA: no litigation reportedSai Baba Nagar Residential With Shopline Building With A B C Wings
📍 Nallasopara West, Palghar · 401203
544
Units
2026
Possession
3
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2026
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop109–268 ft²On request
1 BHK300–390 ft²On request
2 BHK534–560 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000015106
Registered
—
Litigation
No reported in source
Escrow Bank
Bassein Catholic Cooperative Bank Limited
Architect
—
Total FSI
24518
04
Buildings · 3 Wing(s)
Wing A— floors · — units
Wing B— floors · — units
Wing C— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Nallasopara West
19.416676100000000,72.798370500000004
19.416676100000000,72.798370500000004
▸ Explore map & Street View — for verified buyers
09
Construction Progress
6% avgExcavation70%
Overall Percentage of Completion of the work done For the entire Building /Wing7%
Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsStreet LightingWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Shreeji Associates
15
MahaRERA projects nearby in Nallasopara West
SHALIBHADRA YASH153 unitsAV AASHIRWAD GARDEN111 unitsSHALIBHADRA AMORA106 unitsSTUTI EMERALD102 unitsNIRMAL HEIGHTS BLDG NO.0278 unitsELLORA CHSL74 unitsPARK VIEW CO OP HOUSING SOCIETY LIMITED68 unitsDEEP EMERALD57 unitsRAMESH HEIGHTS32 unitsAmin Heritage1 unitsDHANANJAY HEIGHTS1 unitsMUKUNDAN NIRVANA
?
Frequently Asked Questions
When is possession of Sai Baba Nagar Residential With Shopline Building With A B C Wings?
As per MahaRERA, proposed possession is Dec 2026.
Is Sai Baba Nagar Residential With Shopline Building With A B C Wings RERA-registered?
Yes — MahaRERA registration P99000015106. The current MahaRERA source record reports no litigations.
Who is the developer?
Shreeji Associates — 36 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.