RERA: A51800043517

SATRA PARK

by SHREENIVAS DEVELOPERS Partnership
Certificate Signed P51800007235
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800007235
Registration No.
REA51800012058
Registration Date
2021-09-09
Developer
SHREENIVAS DEVELOPERS Partnership
Architect
Vivek J Bhole
Project Bank
RBL Bank Limited
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
16560.00 sq.m
Total FSI
24268.70
Approved FSI
24268.70
MahaRERA QR
SATRA PARK
MahaRERA — P51800007235
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
⬇️Basements2
🅿️Closed Parking157
📅Completion1900-01-01
🏗️Proposed Floors21
Sanctioned21
⬇️Basements2
🅿️Closed Parking145
📅Completion1900-01-01
🏗️Proposed Floors22
Sanctioned22
⬇️Basements2
🅿️Closed Parking157
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Bhk 76.63999938964844 0 0 0
0%
2 Bhk 78.31999969482422 0 0 0
0%
2Bhk 76.63999938964844 0 0 0
0%
3 Bhk 107.0199966430664 0 0 0
0%
3 Bhk 119.19000244140625 0 0 0
0%
4 Bhk 146.7899932861328 0 0 0
0%
4 Bhk 147.25 0 0 0
0%
4 Bhk 158.77000427246094 0 0 0
0%
5 Bhk 208.00999450683594 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 76.64 28 28 0
100%
2 BHK 78.32 21 21 0
100%
3 BHK 107.02 28 28 0
100%
3 BHK 119.19 2 2 0
100%
4 BHK 146.79 2 2 0
100%
4 BHK 147.25 1 1 0
100%
4 BHK 158.77 1 1 0
100%
5 bhk 208.01 2 2 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 76.64 26 26 0
100%
2 BHK 78.32 44 44 0
100%
3 BHK 119.19 4 4 0
100%
4 BHK 146.79 2 2 0
100%
4 BHK 147.25 2 2 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 76.64 28 28 0
100%
2 BHK 78.32 21 21 0
100%
3 BHK 107.02 28 28 0
100%
3 BHK 119.19 2 2 0
100%
4 BHK 146.79 2 2 0
100%
4 BHK 158.77 2 2 0
100%
5 BHK 208.01 2 2 0
100%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate94%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING A

Plinth100%
Podiums (if any) 100%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate94%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING B

Plinth100%
Podiums (if any) 100%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate91%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING C

Plinth100%
Podiums (if any) 100%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.95%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 50%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 90%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 40%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 95%
Solid Waste Management And Disposal 50%
Storm Water Drains 100%
Street Lighting
SWIMMING POOL 75%
Treatment And Disposal Of Sewage And Sullage Water 20%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly