RERA: A51800043517

Shraddha Skyline

by Shraddha Developers & Realtors
Certificate SignedP51800053170

Project Information

RERA Certificate No.
P51800053170
Registration No.
REA51800146478
Registration Date
2024-05-22
Developer
Shraddha Developers & Realtors
Architect
Divyesh Parekh
Project Bank
UNION BANK OF INDIA
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
157
Units Sold
28 (18%)
Buildings
2
Project Area
4345.43 sq.m
Total FSI
15194.16
Approved FSI
15194.16
MahaRERA QR
Shraddha Skyline
MahaRERA — P51800053170
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking231
📅Completion2026-12-31
🅿️Closed Parking25
📅Completion2026-12-31

Apartment Configurations

Shraddha Skyline Wing - A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.5513112
85%
1 BHK44.33651
83%
1 BHK45.55660
100%
2 BHK28.34101
0%
2 BHK47.33101
0%
2 BHK52.16871
88%
2 BHK59.9213130
100%
2 BHK66.06330
100%
2 BHK70.2724177
71%
3 BHK79.05110
100%
3 BHK85.5426233
88%
3 BHK95.96110
100%
3 BHK105.39220
100%
3 BHK109.8920155
75%
3 BHK178.91211
50%
4 BHK145.8725520
20%
4 BHK205.86202
0%

Shraddha Skyline Wing - B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Clinic50.33101
0%
Rehab Dharamshala 1326.67110
100%
Rehab Dharamshala 1338.62110
100%
Rehab Dharamshala 2144.85110
100%
Rehab M P Room47.0110
100%

Construction Progress

Shraddha Skyline Wing - A

Basement (if any)100%
Excavation90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure51%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks51%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure18%

Shraddha Skyline Wing - B

Basement (if any)100%
Excavation90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure51%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks51%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure18%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.