๐Ÿ“ž +91 98200 30685โœ‰๏ธ
RERA: A51800043517

SUNNY HOUSING

by KIRAN DILIP CHAVAN Individual
MahaRERA RegisteredP52000054618
๐Ÿ’ฌ WhatsApp๐Ÿ“ž Call

Project Information

RERA Certificate No.
P52000054618
Registration No.
REA52000146047
Registration Date
2024-02-02
Developer
KIRAN DILIP CHAVAN Individual
Architect
Brahmand Architect
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-12-31
Total Units
59
Units Sold
10 (17%)
Project Area
1005.00 sq.m
Total FSI
2264.71
Approved FSI
2264.71
MahaRERA QR
SUNNY HOUSING
MahaRERA โ€” P52000054618
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors7
โœ…Sanctioned7
๐Ÿ Habitable7
๐Ÿ”ขTotal Units35
๐ŸกResidential28
๐ŸขNon-Residential7
๐Ÿ—๏ธProposed Floors6
โœ…Sanctioned6
๐Ÿ Habitable6
๐Ÿ”ขTotal Units24
๐ŸกResidential24

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1Bhk29.8799991607666000
0%
1Bhk31.229999542236328000
0%
1Bhk31.530000686645508000
0%
1Bhk31.559999465942383000
0%
1Bhk31.6299991607666000
0%
1Bhk31.670000076293945000
0%
1Bhk35.619998931884766000
0%
2Bhk43.400001525878906000
0%
Shop5.769999980926514000
0%
Shop6.940000057220459000
0%
Shop11.279999732971191000
0%
Shop11.5000
0%
Shop11.819999694824219000
0%
Shop12.050000190734863000
0%
Shop13.359999656677246000
0%

Construction Progress

SUNNY NX A-WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 20%

SUNNY NX B-WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor 20%
CallWhatsApp
โœ‰๏ธ

Get in Touch

Our team will connect with you shortly

+91
๐Ÿ”’ Your details are secure with us
โšก If need urgent details +91 98200 67525 for further details.