RERA: A51800043517

The Castle

by Solidago Realty
Certificate SignedP51800047865

Project Information

RERA Certificate No.
P51800047865
Registration No.
REA51800122580
Registration Date
2024-06-03
Developer
Solidago Realty
Architect
Parivartan Architect & Engineer
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-08-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
4
Project Area
3984.96 sq.m
Total FSI
14390.00
Approved FSI
11885.82
MahaRERA QR
The Castle
MahaRERA — P51800047865
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
Sanctioned14
📅Completion2027-08-30
🏗️Proposed Floors14
Sanctioned14
📅Completion2027-08-30
🏗️Proposed Floors14
Sanctioned14
📅Completion2027-08-30
🏗️Proposed Floors14
Sanctioned14
📅Completion2027-08-30

Apartment Configurations

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK57.3826
25%
2 BHK61.3101
0%
2 BHK65.75514
20%
3 BHK80.72404
0%
3 BHK85.321037
30%
Member24.76110
100%
Member25.09110
100%
Member29.29110
100%
Member30.63110
100%
Member57.3330
100%
Member58.86330
100%
Member59.97220
100%
Member77.76220
100%
Member80.72330
100%
Member85.32220
100%
Nursing411.0101
0%
Shop24.39101
0%
Shop25.88101
0%
Shop27.12101
0%
Shop27.59101
0%
Shop29.27101
0%
Shop32.17101
0%
Shop32.42101
0%
Shop33.71101
0%
Shop34.03101
0%
Shop34.23101
0%
Shop34.64101
0%
Shop34.69101
0%
Shop36.67101
0%
Shop39.67101
0%
Shop40.2101
0%
Shop42.83101
0%
Shop45.63101
0%
Shop51.66101
0%
Shop53.99101
0%
Shop55.58101
0%
Shop56.09101
0%
Shop59.65101
0%
Shop66.71101
0%
Shop76.37101
0%
Shop77.08101
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK58.39303
0%
2 BHK59.67202
0%
3 BHK78.92110
100%
3 BHK81.15303
0%
Member53.6330
100%
Member56.27550
100%
Member57.1330
100%
Member59.67440
100%
Member76.92220
100%
Member78.92440
100%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK36.56303
0%
2 BHK58.78404
0%
2 BHK59.27303
0%
2 BHK60.02101
0%
2 BHK60.23303
0%
2 BHK61.64303
0%
2 BHK62.61404
0%
Member13.82110
100%
Member18.11110
100%
member20.3110
100%
Member20.6220
100%
Member26.9110
100%
Member30.11110
100%
Member36.56220
100%
Member57.43440
100%

D Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK38.9532
60%
1 BHK39.77110
100%
1 BHK45.25110
100%
2 BHK55.83422
50%
3 BHK75.451028
20%
3 BHK75.91101
0%
Member31.94110
100%
Member37.05440
100%
Member38.8110
100%
Member38.9220
100%
Member43.93660
100%
Restaurant211.27101
0%

Construction Progress

A WING

Basement (if any)90%

A Wing

Excavation95%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

A WING

Plinth90%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

A Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure75%

B WING

Basement (if any)90%

B Wing

Excavation95%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

B WING

Plinth90%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

B Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure75%

C WING

Basement (if any)90%

C Wing

Excavation95%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

C WING

Plinth90%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

C Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure75%

D WING

Basement (if any)90%

D Wing

Excavation95%

D WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

D Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

D WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%

D Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing25%

D WING

Plinth90%
Podiums (if any) 0%

D Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

D WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure90%

D Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

D WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

D Wing

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure70%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly