💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800046773
Registration No.
REA51800118144
Registration Date
2022-09-05
Developer
LUCRATIVE TRADING LLP Partnership
Architect
Sapre And Associates Architect
Project Bank
AXIS BANK
Proposed Possession
2027-09-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
34
Units Sold
11 (32%)
Buildings
3
Project Area
2748.00 sq.m
Total FSI
8000.00
Approved FSI
6624.73
MahaRERA QR
GATEWAY RESIDENTIAL
MahaRERA — P51800046773
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors11
Sanctioned11
🏠Habitable8
🔢Total Units13
🏡Residential13
⬇️Basements2
📅Completion2027-09-30
🏗️Proposed Floors11
Sanctioned11
🏠Habitable8
🔢Total Units9
🏡Residential9
⬇️Basements2
📅Completion2027-09-30
🏗️Proposed Floors11
Sanctioned11
🏠Habitable8
🔢Total Units12
🏡Residential12
⬇️Basements2
📅Completion2027-09-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 48.959999084472656 0 0 0
0%
2Bhk 67.81999969482422 0 0 0
0%
2Bhk 68.7300033569336 0 0 0
0%
2Bhk 70.75 0 0 0
0%
2Bhk 71.91000366210938 0 0 0
0%
2Bhk 75.72000122070312 0 0 0
0%
3Bhk 101.23999786376953 0 0 0
0%
3Bhk 102.36000061035156 0 0 0
0%
3Bhk 102.55999755859375 0 0 0
0%
3Bhk 102.6500015258789 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 67.82 4 0 4
0%
2 BHK 70.75 1 0 1
0%
3 BHK 102.65 2 0 2
0%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 68.73 6 0 6
0%

C Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 67.82 3 0 3
0%
2 BHK 71.91 1 0 1
0%
2 BHK 75.72 1 1 0
100%
3 BHK 101.24 1 0 1
0%
3 BHK 102.56 3 0 3
0%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing41%

A WING

Plinth100%
Podiums (if any) 0%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing41%

B WING

Plinth100%
Podiums (if any) 0%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%
Overall Percentage of Completion of the work done For the entire Building /Wing41%

C WING

Plinth100%
Podiums (if any) 0%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure80%

RERA Registered Amenities

Aggregate area of recreational Open Space
COMMON AREA LIGHTING
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
SIDE MARGIN PAVEMENT
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.