📞 +91 98200 30685 ✉️
RERA: A51800043517

VICINIA

by FORBES & COMPANY LIMITED Company
Certificate Signed P51800002564
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800002564
Registration No.
REA51800008504
Registration Date
2022-07-12
Developer
FORBES & COMPANY LIMITED Company
Architect
Brighton Architects India Pvt Ltd
Project Bank
AXIS BANK
Proposed Possession
2022-06-30
Revised Possession
2022-06-30
Extended Possession
2023-06-30
Units Sold
0
Buildings
8
Project Area
27263.50 sq.m
Total FSI
60669.00
Approved FSI
31929.05
MahaRERA QR
VICINIA
MahaRERA — P51800002564
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
⬇️Basements3
🚗Open Parking17
🅿️Closed Parking98
📅Completion2021-06-30
🏗️Proposed Floors25
Sanctioned25
⬇️Basements3
🚗Open Parking17
🅿️Closed Parking98
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking22
🅿️Closed Parking126
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking23
🅿️Closed Parking126
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking26
🅿️Closed Parking145
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking26
🅿️Closed Parking149
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking19
🅿️Closed Parking107
📅Completion2021-06-30
🏗️Proposed Floors26
Sanctioned26
⬇️Basements3
🚗Open Parking19
🅿️Closed Parking106
📅Completion2021-06-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
Residential 38.4900016784668 0 0 0
0%
Residential 62.33000183105469 0 0 0
0%
Residential 77.9800033569336 0 0 0
0%
Residential 89.9000015258789 0 0 0
0%
Residential 94.08999633789062 0 0 0
0%
Residential 94.72000122070312 0 0 0
0%
Residential 95.33999633789062 0 0 0
0%
Residential 106.47000122070312 0 0 0
0%
Residential 140.14999389648438 0 0 0
0%
Residential 140.80999755859375 0 0 0
0%

Wing A

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 140.15 34 34 0
100%
RESIDENTIAL 140.81 6 6 0
100%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 140.15 34 34 0
100%
RESIDENTIAL 140.81 6 6 0
100%

Wing C

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 77.98 42 42 0
100%
RESIDENTIAL 89.9 21 21 0
100%
RESIDENTIAL 94.72 18 18 0
100%
RESIDENTIAL 95.34 3 3 0
100%

Wing D

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 77.98 42 42 0
100%
RESIDENTIAL 89.9 21 21 0
100%
RESIDENTIAL 94.72 18 18 0
100%
RESIDENTIAL 95.34 3 3 0
100%

Wing E

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 38.49 2 0 2
0%
RESIDENTIAL 77.98 40 40 0
100%
RESIDENTIAL 94.09 19 17 2
89%
RESIDENTIAL 94.72 18 17 1
94%
RESIDENTIAL 95.34 3 3 0
100%

Wing F

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 77.98 40 40 0
100%
RESIDENTIAL 94.09 21 21 0
100%
RESIDENTIAL 94.72 16 16 0
100%
RESIDENTIAL 95.34 3 3 0
100%
RESIDENTIAL 106.47 2 2 0
100%

Wing G

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 62.33 88 84 4
95%

Wing H

Type Carpet (sq.ft) Total Booked Available Status
RESIDENTIAL 62.33 88 84 4
95%

Construction Progress

WING A

Basement (if any)100%

Wing A

Excavation100%

WING A

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing A

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate97%

WING A

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing A

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING A

Plinth100%
Podiums (if any) 0%

Wing A

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING A

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing A

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING A

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing A

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING B

Basement (if any)100%

Wing B

Excavation100%

WING B

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing B

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate97%

WING B

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing B

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING B

Plinth100%
Podiums (if any) 0%

Wing B

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING B

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing B

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING B

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing B

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING C

Basement (if any)100%

Wing C

Excavation100%

WING C

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing C

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate97%

WING C

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing C

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING C

Plinth100%
Podiums (if any) 0%

Wing C

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING C

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing C

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING C

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing C

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING D

Basement (if any)100%

Wing D

Excavation100%

WING D

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing D

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate96%

WING D

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing D

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING D

Plinth100%
Podiums (if any) 0%

Wing D

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING D

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing D

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING D

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing D

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING E

Basement (if any)100%

Wing E

Excavation100%

WING E

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.61%

Wing E

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate38%

WING E

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises56%

Wing E

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises56%

WING E

Plinth100%
Podiums (if any) 0%

Wing E

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING E

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing E

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.74%

WING E

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%

Wing E

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing61%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING F

Basement (if any)100%

Wing F

Excavation100%

WING F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Wing F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate91%

WING F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Wing F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%

WING F

Plinth100%
Podiums (if any) 0%

Wing F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

WING F

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Wing F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

WING F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Wing F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING G

Basement (if any)100%

Wing G

Excavation100%

WING G

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73%

Wing G

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate33%

WING G

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.33%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%

Wing G

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises58%

WING G

Plinth100%
Podiums (if any) 0%

Wing G

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises3%

WING G

Sanitary Fittings within the flats / premises3%
Slabs of Super Structure100%

Wing G

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.74%

WING G

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%

Wing G

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing73%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

WING H

Basement (if any)100%

Wing H

Excavation100%

WING H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.54%

Wing H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate29%

WING H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.29%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%

Wing H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises40%

WING H

Plinth100%
Podiums (if any) 0%

Wing H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

WING H

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Wing H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.60%

WING H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%

Wing H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing54%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 62%
Community Buildings 35%
Community Buildings Club House 35%
Covered car parkings 100%
Electrical Meter Room, Sub-Station, Receiving Station 80%
Energy management 77%
Fire Protection And Fire Safety Requirements 63%
Landscaping & Tree Planting 60%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 83%
Solid Waste Management And Disposal 50%
Storm Water Drains 63%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water 80%
Water Conservation, Rain water Harvesting 100%
Water Supply 76%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.