Metro Millenium vs Ascend Tower
A detailed comparison of Metro Millenium in Malad West and Ascend Tower in Malad West. Compare pricing, RERA status, configurations, possession dates, and amenities to make an informed decision.

Metro Millenium

Ascend Tower
Compare sizes and total prices
Recorded configurations and indicative prices. Unit availability, taxes, charges and the final quote need confirmation.
| Configuration | Metro Millenium | Ascend Tower |
|---|---|---|
| 1 BHK · carpet area | Not recorded | 400 sq ft |
| 1 BHK · indicative total price | Not recorded | ₹1.12 crore |
| 2 BHK · carpet area | 680 sq ft / 716 sq ft | 547 sq ft |
| 2 BHK · indicative total price | ₹1.9 crore / ₹2 crore | ₹1.53 crore |
| 3 BHK · carpet area | Not recorded | 691 sq ft |
| 3 BHK · indicative total price | Not recorded | ₹1.93 crore |
Project record updates: Metro Millenium — 28 April 2026; Ascend Tower — 14 September 2026. These dates do not confirm when a price was last verified. “Not recorded” does not mean unavailable.
📊 Side-by-Side Comparison
| Parameter | Metro Millenium | Ascend Tower |
|---|---|---|
| Location | Malad West, Ramchandra Lane, Adarsh Nagar | Malad West, Off. Chincoli Bunder Rd, NL Cross Rd, Beside Dheeraj Solitaire, |
| Developer | Metro Realty | Mamtora Associates |
| Construction Status | Under Construction | Under Construction |
| Indicative rate per sq.ft. | ₹27,900 | ₹28,000 |
| Recorded possession target | Dec 2026 | Dec 2026 |
| Configurations | 2 BHK | 1 BHK, 2 BHK, 3 BHK |
| RERA Number | P51800051411 | P51800049273 |
| Project Type | Residential | Residential |
| Floors | 18 | 20 |
| Recorded feature labels | 21 | 24 |
Plans and brochures
Metro Millenium
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorAscend Tower
No verified floor-plan link is currently recorded.
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorFacilities and specifications
Metro Millenium
Aluminium Sliding WindowsConcealed PlumbingConcealed WiringGrand entrance lobbyGranite PlatformGymnasiumHigh speed elevatorsImported Sanitary FittingsIntercom/CCTVKid's play areaLandscaped gardenMarble flooringMulti Purpose HallOutdoor GamesPOP finished wallsPower BackupReception DeskSecurity Help DeskSwimming PoolVideo Door PhonesVitrified flooringAscend Tower
24x7 SecurityCCTV SurveillanceClubhouseConcealed PlumbingConcealed WiringCovered ParkingDesigner FittingsFire Safety SystemGarden / LandscapeGymnasiumIndoor GamesKids Play AreaLibrary / Reading RoomMini TheatreModern ElevatorsModular KitchenRainwater HarvestingSenior Citizen AreaSky Lounge / DeckTerrace GardenVideo Door PhoneVisitor ParkingVitrified TilesYoga / Meditation❓ Frequently Asked Questions
How do the recorded prices compare?
Metro Millenium has the lower recorded indicative rate, by ₹100/sq ft. Compare the configuration-level total prices and carpet areas above. A lower rate does not necessarily mean a lower total price; confirm the exact unit and charges with an advisor.
What are the recorded possession targets?
Metro Millenium: Dec 2026. Ascend Tower: Dec 2026. These are recorded targets, not delivery guarantees. Confirm the applicable tower and phase on MahaRERA and with the developer.
Which RERA records apply?
Metro Millenium: P51800051411. Ascend Tower: P51800049273. Verify the relevant project phase on the official MahaRERA website.
How should I compare the listed features?
These records mix facilities and specifications, and may use different names for similar features. A longer list does not establish a better project. Confirm which features apply to your tower and unit, and compare the ones that matter to you.
