📞 +91 98200 30685 ✉️
RERA: A51800043517

5TH ELEMENT

by PRATHAM VARADVINAYAK BUILDERS AND DEVELOPERS PRIVATE LIMITED Company
Certificate Signed P51800050904
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800050904
Registration No.
REA51800124566
Registration Date
2023-08-12
Developer
PRATHAM VARADVINAYAK BUILDERS AND DEVELOPERS PRIVATE LIMITED Company
Architect
Prathamesh Associates
Project Bank
HDFC BANK
Proposed Possession
2026-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
804.18 sq.m
Total FSI
6805.00
Approved FSI
5836.89
MahaRERA QR
5TH ELEMENT
MahaRERA — P51800050904
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors19
Sanctioned19
🅿️Closed Parking24
📅Completion2025-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 43.20000076293945 0 0 0
0%
2Bhk 60.939998626708984 0 0 0
0%
2Bhk 67.7300033569336 0 0 0
0%
2Bhk 71.91000366210938 0 0 0
0%

5Th Element

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 43.2 11 4 7
36%
2 BHK 60.94 3 0 3
0%
2 BHK 67.73 17 3 14
18%
2 BHK 71.91 17 3 14
18%

Construction Progress

5TH ELEMENT

Basement (if any)95%

5Th Element

Excavation95%

5TH ELEMENT

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%

5Th Element

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate10%

5TH ELEMENT

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%

5Th Element

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises30%

5TH ELEMENT

Plinth95%
Podiums (if any) 0%

5Th Element

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

5TH ELEMENT

Sanitary Fittings within the flats / premises25%
Slabs of Super Structure90%

5Th Element

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

5TH ELEMENT

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%

5Th Element

Stilt Floor60%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing15%
X number of Basement(s) and Plinth95%
X number of Podiums0%
X number of Slabs of Super Structure76%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal 65%
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.